Tiger Files For Chapter 7 Bankruptcy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.09.24

Airborne-NextGen-12.10.24

Airborne-Unlimited-12.11.24

Airborne AffordableFlyers-12.12.24

Airborne-Unlimited-12.13.24

Wed, Jan 24, 2007

Tiger Files For Chapter 7 Bankruptcy

The Martinsburg, WV Airplane Builder Finally Folds

Tiger Aircraft filed for Chapter 7 bankruptcy on January 16 in a US bankruptcy court. Papers filed listed assets of $3.2 million and $929,000 in debt. Not included in the filing is $4 million worth of bonds sold to build the Martinsburg manufacturing plant.

Under Chapter 7 rules, the company's assets will be liquidated to pay its debts, but it's not known how the court will approach the bonds. West Virginia's Economic Development Authority, the bond's issuer, is not considered a creditor and as such has no claim to any Tiger assets. The state agency remains the title holder of Tiger's manufacturing plant -- its only concession.

Tiger's original plan to resurrect a modern version of an aircraft design dating back to the late 1960s followed a successful similar return to production for Cessna's venerable 172 and 182 models.

US Senator Jay Rockefeller, who played a key role in attracting Taiwanese investors to West Virginia and Tiger, said in a statement, "I continue to watch for and encourage economic and job opportunities in our state. And although Tiger's venture in the Eastern Panhandle has seen more than its share of highs and lows, I'm hopeful that if Tiger's assets are used in the future, they are used in West Virginia."

The company's business plan when it opened its doors in 2001 was to produce 70 aircraft per year in a $30 million manufacturing facility employing 400. Sadly, history tells a different story...

In Tiger's best year -- 2004 -- sales reached their zenith of $3.1 million; it's been a steady descent for the company since. In 2005, the factory shipped 15 planes, then only three for the first ten months of 2006.

Tiger employed 60 at one time, but layoffs held close formation with declining sales throughout 2005 and 2006.

The company's poor sales performance led to the loss of Tiger's vice president of sales last May, then company president Gene Criss in August. Its court filings say Tiger's board voted to enter bankruptcy last July.

According to the Martinsburg Journal, Tiger’s office building was empty on Monday. No cars were in the parking lot, no flags were flying from the poles standing in the building’s driveway, and the building was dark.

FMI: www.wvdo.org, www.uscourts.gov/bankruptcycourts.html

Advertisement

More News

Aero-News: Quote of the Day (12.10.24)

“We’re watching the very nature of warfare change. The speed of technology is absolutely meteoric.” Source: Maj. Gen. Clair Gill, commanding general of the Fort N>[...]

ANN's Daily Aero-Term (12.10.24): Handoff

Handoff An action taken to transfer the radar identification of an aircraft from one controller to another if the aircraft will enter the receiving controller's airspace and radio >[...]

ANN's Daily Aero-Linx (12.10.24)

Aero Linx: European Association of Aviation Training and Education Organizations – EATEO EATEO aspires to be the European voice for driving the best aviation training and edu>[...]

Aero-News: Quote of the Day (12.11.24)

“Think spacious modules with large windows to view Earth, our blue origin, while experiencing the thrill of weightlessness in complete comfort. Distinct quarters will be desi>[...]

ANN's Daily Aero-Term (12.11.24): Altitude Restriction

Altitude Restriction An altitude or altitudes, stated in the order flown, which are to be maintained until reaching a specific point or time. Altitude restrictions may be issued by>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC