Sea Launch Begins New Countdown For Thuraya-3 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneNextGen-
10.21.25

Airborne-Unlimited-10.22.25

Airborne-FltTraining-10.23.25

AirborneUnlimited-10.17.25

Mon, Jan 14, 2008

Sea Launch Begins New Countdown For Thuraya-3 Launch

Liftoff Scheduled Early Tuesday Morning

Representatives with Sea Launch tell ANN its team has arrived at its launch site on the Equator and initiated a new 72-hour countdown, in preparation for the launch of the Thuraya-3 mobile communications satellite on Tuesday, January 15. Liftoff is planned at the opening of a 44-minute window, at 0349 Pacific Standard Time (1149 GMT).

As ANN reported, a November launch attempt was scrubbed due to unusually strong currents. The Sea Launch Commander and the Odyssey Launch Platform have returned to the launch site at 154 degrees West Longitude for launch operations. A day before liftoff, the launch team will erect the Zenit-3SL rocket on the launch pad and perform final tests on the launch system and the spacecraft before beginning the terminal countdown.

During final preparations for liftoff, the platform will be evacuated, with all personnel safely positioned on the ship, four miles from the platform. At launch, the rocket will lift the 5,173 kg (11,381 lb) spacecraft to geosynchronous transfer orbit, on its way to a final orbital location of 98.5 degrees East Longitude.

Boeing designed and built the GEO-Mobile (GEM) spacecraft in El Segundo, CA, for Thuraya Satellite Telecommunications Company, based in the United Arab Emirates. Boeing also built, and Sea Launch successfully deployed, Thuraya-1 (October 20, 2000) and Thuraya-2 (June 10, 2003). The satellites are designed to provide a range of mobile voice and data services over large geographic regions.

FMI: www.boeing.com/nosearch/sealaunch, www.sealaunch.com

Advertisement

More News

Affordable Flying Expo Announces Industry MOSAIC Town Hall

Scheduled for Friday, November 7th at 1800ET, The MOSAIC Town Hall, Webcast At www.airborne-live.net One of the more intriguing features of the 2025 Affordable Flying Expo, schedul>[...]

Classic Aero-TV: Composite-FX Sets Elevates the Personal Helicopter Market

From 2023 (YouTube Edition): The Mosquito Evolves Formerly known as Mosquito, Trenton, Florida-based Composite FX is a designer and manufacturer of personal kit and factory-finishe>[...]

Aero-News: Quote of the Day (10.25.25)

“The Board is pleased to name Lisa as our next CEO after conducting a comprehensive succession planning process and believes this transition will ensure continued success for>[...]

ANN's Daily Aero-Term (10.25.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

NTSB Final Report: Gallow Daniel A Kitfox Classic IV

The Airplane Stalled Above The Runway Threshold, The Nose Dropped, The Nose Wheel Impacted The Runway, And The Airplane Flipped Over Analysis: The pilot reported that during the fi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC