ISS' 50th Spacewalk Coming Soon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Jan 13, 2003

ISS' 50th Spacewalk Coming Soon

Int'l Space Station Status Report, 1600 CST, Jan. 10, 2003, Expedition 6 Crew

Preparations continue in orbit for the 50th spacewalk dedicated to assembly and maintenance of the International Space Station. Commander Ken Bowersox and NASA ISS Science Officer Don Pettit are scheduled to step outside Wednesday about 6:30 a.m. CST.

The crewmembers spent this week reviewing the timeline and procedures, organizing tools, and preparing the spacesuits and the Quest airlock for the 6½-hour spacewalk. During the outing, Bowersox and Pettit will release launch restraints to permit deployment of a cooling radiator on the Port 1 truss segment and clean the attach point on the Unity Node for station cargo modules. They also will install a work light and a foot restraint on an astronaut handcar for future spacewalking construction workers to use. Flight Engineer Nikolai Budarin will provide support for Bowersox and Pettit from inside the station. NASA television spacewalk coverage starts at 5 a.m. CST Wednesday.

Bowersox provided data to scientists for the FOOT (Foot/Ground Reaction Forces During Spaceflight) experiment, which looks at how the arms, hips, knees, legs and feet move in the absence of gravity, and at what changes occur in bones and muscles during spaceflight. Bowersox wore a special pair of cycling pants with 20 sensors on his legs and additional sensors on his arms that took electrical impulse measurements throughout his workday Tuesday.

All three crewmembers participated in a monthly lung-function test, to study the effects of weightlessness. The crewmembers forcefully exhaled into a device which stored lung capacity measurements in an onboard medical computer. The session served as the pre-spacewalk reading for Bowersox and Pettit, while the experiment also studies how wearing low-pressure spacesuits affects lung performance. They will participate in another session after the spacewalk.

Thursday, Bowersox and Pettit operated the space station robotic arm, Canadarm2, to do camera surveys of exterior hardware in the station's expanding thermal control system. They maneuvered Canadarm2 into positions to inspect the location of thermal blankets on cooling lines and the S1 and S0 trusses and also survey the condition of the radiator on the P6 truss. Engineers on the ground will review the footage for any irregularities.

FMI: http://spaceflight.nasa.gov, www.scipoc.msfc.nasa.gov/

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC