Boeing Completes Certification Testing for New 787 Battery System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Apr 09, 2013

Boeing Completes Certification Testing for New 787 Battery System

Final Test Flight Conducted Late Last Week With An Airplane Intended For LOT Polish Airlines

Boeing completed a 787 certification demonstration flight late last week on line number 86, a Boeing-owned production airplane built for LOT Polish Airlines. The flight marked the final certification test for the new battery system, completing the testing required by the FAA.

The flight, conducted Friday, departed from Paine Field in Everett, WA. at 1039 PDT with a crew of 11 onboard, including two representatives from the FAA. The airplane flew for an hour and 49 minutes, landing back at Paine Field at 1228.

The crew reported that the certification demonstration plan was straightforward and the flight was uneventful. The purpose of the flight was to demonstrate that the new battery system performs as intended during normal and non-normal flight conditions.

Boeing will now gather and analyze the data and submit the required materials to the FAA. The company said in a statement that it expects to deliver all of the materials to the FAA in the coming days. Once the materials are delivered, Boeing says it stands ready to reply to additional requests and continue in dialog with the FAA to ensure it has met all of the agencies expectations.

(Image provided by Boeing)

FMI: www.boeing.com, www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.30.25)

Aero Linx: Aviators Code Initiative (ACI) Innovative tools advancing aviation safety and offering a vision of excellence for aviators. The ACI materials are for use by aviation pra>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: Agile Aero’s Jeff Greason--Disruptive Aerospace Innovations

From 2016 (YouTube Edition): Who You Gonna Call When You Have a Rocket Engine that Needs a Spacecraft? While at EAA AirVenture 2016, ANN CEO and Editor-In-Chief, Jim Campbell, sat >[...]

Aero-News: Quote of the Day (04.30.25)

"In my opinion, if this isn't an excessive fine, I don't know what is... The odds are good that we're gonna be seeking review in the United States Supreme Court. So we gotta muster>[...]

ANN's Daily Aero-Term (04.30.25): Expedite

Expedite Used by ATC when prompt compliance is required to avoid the development of an imminent situation. Expedite climb/descent normally indicates to a pilot that the approximate>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC