A380 Vertical Tail Plane Assembly Starts In Stade, Germany | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Dec 23, 2003

A380 Vertical Tail Plane Assembly Starts In Stade, Germany

The Airbus plant in Stade, northern Germany, has launched the assembly and equipping of the A380 vertical tail plane, or VTP. The A380 vertical tail plane has a surface120 square metres and integrates many components manufactured in different types of material.

The Airbus plant in Stade is a centre of excellence for carbon fibre reinforced plastic manufacturing and producing the VTP’s spars, ribs, rudder fittings and skin panels. Other parts for the VTP come from Airbus’ facilities in Puerto Real, Spain for the rudders, fin tips and dorsal fins, and from Varel, Germany which manufactures complex machined parts.

Key external suppliers include Japan’s Fuji Heavy Industries, which produces the leading and trailing edge sub-assemblies, as well as the carbon fibre reinforced plastic and metal fin tip, and Labinal, which designs and manufactures the tail’s main electrical cabling, or harnesses.

Several new assembly technologies were introduced to Stade’s production line in a bid to introduce even greater efficiency to the manufacturing process. Much of the A380 tail is produced from carbon fibre reinforced plastic and to ensure that the outer shape is perfectly smooth, Airbus applies a levelling material, or shim, between the inner parts and the skin panels. Airbus has now largely automated the shim preparation and application technique, slashing the application time of the material and ensuring maximum density.

Once assembled, the A380 VTP will be transported by truck to the River Elbe, where it will be loaded onto a barge and sent to Hamburg at the end of May 2004.

After painting in Hamburg, the tail’s lower rudder will be detached and sent in the Beluga transport aircraft to the A380 final assembly hall in Toulouse. The rest of the tail will follow in mid-June 2004 by sea and road.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC