STS-134 Gets To Wait Another Week For Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, May 02, 2011

STS-134 Gets To Wait Another Week For Launch

Shuttle Endeavour Launch No Earlier Than May 8

While the ANN crew sure enjoyed the few hours we spent last week at the cape in preparation for the launch of STS-134 ... we sure did not enjoy the other ritual we have come to know all too well... the Launch Scrub.

NASA managers have determined space shuttle Endeavour will not launch before Sunday, May 8, but will not officially set a new launch date until early this week. After Friday's launch scrub, Kennedy Space Center technicians searched for the cause of a failure in a heater circuit associated with Endeavour's hydraulic power system. The failure was found to be in a power circuit in a switchbox in the shuttle's aft compartment.

Managers and engineers are developing a schedule to remove and replace the switchbox and retest the new unit. That work will delay Endeavour's launch until at least May 8.

The shuttle has three Auxiliary Power Units (APUs) that provide hydraulic power to steer the vehicle during ascent and entry. The hydrazine fuel lines on each APU have two heater circuits that prevent the fuel from freezing while the shuttle is in space. NASA launch commit criteria and flight rules require all three APUs and heater circuits to be operational for liftoff.

Endeavour's six astronauts have returned to NASA's Johnson Space Center in Houston for several days of additional training -- and in the meantime, the ANN and Aero-TV launch coverage crew looks forward to an actual launch -- someday. 

FMI: www.nasa.gov/shuttle 

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC