G650 Passes Several Testing Milestones | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Aug 15, 2011

G650 Passes Several Testing Milestones

Gulfstream Says The Aircraft Is On Track For Certification In 2011, Deliveries In 2012

Gulfstream’s G650 recently completed several flight-testing milestones en route to its anticipated type certification later this year by the FAA and EASA. As of July 16, the four aircraft in the flight-test program had accumulated more than 1,760 hours over more than 535 flights.

“We’re on track and moving steadily toward certification later this year,” said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. “We’ve accomplished a great deal in the past two months. The aircraft continue to perform extremely well.”

Aircraft Number 6004, the first Gulfstream test aircraft to have a fully outfitted interior, finished certification testing of the aircraft’s water and waste systems, its traffic collision avoidance system (TCAS) and its enhanced ground proximity warning system (EGPWS). Aircraft Number 6003 has completed certification dry-air testing for the wing and cowl ice protection systems.

Additionally, the four flight-test aircraft accomplished several rounds of company testing in preparation for the FAA evaluations that are part of the certification process. Aircraft 6004 performed hydraulics overpressure testing and satellite communications testing. It also handled testing of the company’s aircraft health and trend monitoring system. The company tested the aircraft’s hydraulics and brakes using Aircraft 6001, the first aircraft to join the flight-test program in 2009. Aircraft 6003 performed company tests of the environmental control system, cabin pressure control system and oxygen system.

The G650 offers the longest range at the fastest speed in its class. Powered by Rolls-Royce BR725 engines, the business jet is capable of traveling 7,000 nautical miles at Mach 0.85 and has a maximum operating speed of Mach 0.925.

Gulfstream announced the G650 program on March 13, 2008. On Sept. 29, 2009, the aircraft rolled out under its own power in front of a crowd of more than 7,000 people. It completed its first flight on Nov. 25, 2009, and remains on schedule for entry-into-service in 2012.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC