MD Helicopters To Continue Support Of Afghan Air Force | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Aug 03, 2019

MD Helicopters To Continue Support Of Afghan Air Force

Awarded $50.4 Million Contract For Continued Support Of MD 530F Cayuse Warriors Fleet

MD Helicopters, Inc. (MDHI) has been awarded a $50.4 million Firm Fixed Price contract modification for logistics support of the MD 530F Cayuse Warrior helicopter fleet currently in service with the Afghan Air Force (AAF). MD Helicopters has provided comprehensive contractor logistics support (CLS) services to the Afghan Air Force since the first MD 530F training aircraft arrived in Afghanistan in 2011.

The current CLS contract extension provides for continuous CONUS and OCONUS maintenance, on-the-job training, and support services, including spares support, for all MD 530F Cayuse Warrior helicopters operated by the Afghan Air Force. Effective September 1, 2019, the Period of Performance for the new contract, with all options exercised, runs through May 31, 2020.

The AAF began operating the MD 530F as a primary rotary wing training aircraft in 2011. In 2014, in response to an urgent and compelling need within the region, MDHI was contracted to arm and weaponize the proven single engine training aircraft, delivering expanded capabilities for armed escort, scout attack and close air attack operations. Nine months later, MDHI delivered the first of a robust fleet of 60 MD 530F Cayuse Warrior light scout attack helicopters.

Currently, MDHI supports all mission-ready MD 530F Cayuse Warrior aircraft in Afghanistan. The final 5 units associated with the 2017 30-unit Delivery Order issued against MDHI’s $1.4 Billion IDIQ contract are set for on-time delivery later this year.

(Image provided with MD Helicopters news release)

FMI: www.mdhelicopters.com

Advertisement

More News

Airborne 07.02.25: TikToker Arrested, Vietnam A/L Ground Hit, ATC Modernization

Also: Outlaw Prop 4 Mooney, Ready 4 Duty, Ukrainian F-16 Pilot Lost, Blue Origin Flt On his journey to become the first pilot to land solo on all seven continents, 19-year-old Etha>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

ANN's Daily Aero-Term (07.07.25): Discrete Code

Discrete Code As used in the Air Traffic Control Radar Beacon System (ATCRBS), any one of the 4096 selectable Mode 3/A aircraft transponder codes except those ending in zero zero; >[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

ANN's Daily Aero-Linx (07.07.25)

Aero Linx: Formation and Safety Team (F.A.S.T.), USA The Formation and Safety Team (FAST) is a worldwide, educational organization dedicated to teaching safe formation flying in Wa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC