Boeing Begins Assembly Of 1st KC-46A Tanker Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jun 28, 2013

Boeing Begins Assembly Of 1st KC-46A Tanker Aircraft

First Delivery Set For 2016

The first wing spar for a U.S. Air Force KC-46A aerial refueling tanker was loaded by Boeing workers in Everett Wednesday, starting production of that aircraft and achieving another milestone toward delivering 179 tankers during the next 14 years. The KC-46A is based on the commercial 767-200ER.

“The Air Force is really excited and pleased that our No. 1 modernization priority has begun fabrication and entered the factory at Everett. The Boeing team continues to make significant progress in the KC-46 development program,” said Maj. Gen. John Thompson, U.S. Air Force Program Executive Officer for Tankers.
 
The spar, the main structural component of the wing, is 82 feet 5 inches long. On the aircraft, it provides critical support for flight loads and the weight of the wings when the plane is not flying. The program’s next major contractual milestone, the Air Force’s Critical Design Review, starts next month.
 
“We are building on the strong partnership that the Air Force and Boeing have developed during the past two years,” said Maureen Dougherty, Boeing vice president and KC-46 Tanker program manager. “From the enhanced flight deck to the modernized boom, our tanker will provide unequaled capabilities that will allow it to offload more fuel and carry more passengers, cargo and medical patients.”
 
Boeing employees are also preparing the 767 production line for assembly of the next-generation tanker’s aft and forward body structures. The aircraft will be assembled in November and roll out of the factory in January. “We’re proud to support the U.S. Air Force with a production line that emphasizes quality, efficiency and safety,” added Scott Campbell, vice president and general manager, 767 Program, Boeing Commercial Airplanes.
 
Next June, Boeing will begin installation of military-unique systems on the aircraft at Boeing Field in Seattle as well as testing. First flight for the fully provisioned tanker is scheduled for early 2015, with first delivery in 2016. Boeing expects to build and deliver the first 18 KC-46As by 2017 and a total of 179 by 2027 if all options under the contract are exercised.

(Image provided by Boeing)

FMI: www.boeing.com, www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC