04.01.15 Special: Sonex Wins Contract With The U.S. Air Force | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.29.25

AirborneNextGen-
09.30.25

Airborne-Unlimited-10.01.25

Airborne-Unlimited-09.25.25

AirborneUnlimited-09.26.25

Wed, Apr 01, 2015

04.01.15 Special: Sonex Wins Contract With The U.S. Air Force

SubSonex Jets Will Replace Thunderbird's F-16s

ANN's April 1 'April Fool' Special Edition

Sonex has landed a contract with the U.S. Air Force to provide SubSonex jets as the next aircraft for the Thunderbirds demonstration team.

The company said on April 1 that it was shipping a dozen kits to Eglin Air Force Base in Florida, where they will be assembled and painted in the distinctive Thunderbirds livery. Sonex founder and President John Monnett said that the USAF would be afforded the same consideration as any builder when it comes to assistance with the assembly of the aircraft, and the government was quoted list price. "I guarantee you they won't need any $900 wrenches to put these birds together," Monnett said.

The Thunderbirds will fly this season in their F-16s, but next year they will shift to the SubSonex aircraft. Secretary of the Air Force Deborah Lee James said that the move was strictly a cost-saving measure, and that she's sure that audiences that attend Thunderbirds performances will not be disappointed. "A jets a jet, right?" James said. "They'll still make a lot of noise, fly pretty fast, and can do almost everything that the F-16s can do, as far as the public is concerned. And the're just as cute as they can be. Besides, we can re-purpose the planes they're flying now into combat roles. It's going to be great for the taxpayer," James said.

"And, we can load the whole team up into one C-5A to travel to shows," James said.

Deliveries of the kits are expected to begin in the second quarter of 2015. "They can build 'em fast," Monnett said.

FMI: www.sonex.com, www.af.mil

Advertisement

More News

Ticket Sales NOW OPEN for 2025 Affordable Flying Expo!

Check out https://affordableflying.net/attend/ Right Away and Get YOUR Tickets To the Affordable Flying Expo! OK.... with a little over a month to go, it’s time to get seriou>[...]

Aero-News: Quote of the Day (09.29.25)

"Amelia made it almost three-quarters of the way around the world before she suddenly, and without notice, vanished—never to be seen again. Her disappearance, almost 90 years>[...]

ANN's Daily Aero-Linx (09.29.25)

Aero Linx: Cessna 150-152 Club The Cessna 150-152 Club has been the go-to place for information about the care and operation of the World’s Most Popular Two-Place Airplane si>[...]

ANN's Daily Aero-Term (09.29.25): Hover Taxi

Hover Taxi Used to describe a helicopter/VTOL aircraft movement conducted above the surface and in ground effect at airspeeds less than approximately 20 knots. The actual height ma>[...]

Airborne 09.26.25: Army Cuts AV-Ranks, 2025 ATC Hiring, AF Next-Gen Fighter

Also: Purdue In Space?, 4 SpecOps Lost In Helo Crash, Solid-Fuel Ramjet, Ultra-High Airspace Over FL The US Army recently confirmed its plans to thin out its active duty aviation r>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC