Exchange Program Offered For 787 Dreamliner Parts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Nov 04, 2010

Exchange Program Offered For 787 Dreamliner Parts

High-Value, Critical Parts Covered By Program

A rotable exchange services program to will support the operation of the Boeing 787 Dreamliner was announced Boeing Tuesday. The planemaker says the program will help airlines reduce inventory costs by providing access to a Boeing-managed inventory pool of parts that is available to ship within 24 hours of request.

"The 787 Rotables Exchange Services Program will provide a dedicated pool of high-value, dispatch-critical parts for airlines, while helping them to improve operations support and cash flow," said Dale Wilkinson, vice president, Material Services for Boeing Commercial Airplanes. "The program manages configuration, warranty and reliability for the covered parts, freeing the airline to focus on passengers and the operation of the airplane."

The exchange program is available to support initial entry into service for 787 operators – this is the first time that such a program has been developed in conjunction with entry into service of a new fleet type.

With the Boeing 787 Rotable Exchange Program, the airline removes a part from the airplane and ships it for exchange with a new unit from Boeing's exchange pool. Boeing plans to support up to 600 high-value rotable parts, including such items as the Auxiliary Power Unit and Variable Frequency Starter Generator. By providing coverage for parts typically priced in the hundreds of thousands of dollars, the exchange program can provide considerable inventory cost savings for airlines.

The program provides a flight-hour cost basis that enables the customer to better forecast maintenance costs, while spreading out high-cost expenditures for rotable parts over the 10-year term of the agreement.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC