Return To Flight On Track | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Sun, Jun 05, 2005

Return To Flight On Track

Ahead Of Schedule Even

Discovery was disconnected from its external tank and Solid Rocket Boosters Thursday and lowered by crane onto the Orbiter Transporter System in the Vehicle Assembly Building. The orbiter is scheduled to move and be attached to its new tank (ET-121) on June 6th.

The new heater installed on the tank should minimize the potential for ice buildup. Technicians then plan to work the final closeouts on the Shuttle and hook up liquid oxygen and liquid hydrogen systems and conduct an interface verification test. Discovery is scheduled to return to the launch pad on June 13th, one day earlier than planned.

Power-up testing continues on Atlantis in the Orbiter Processing Facility as it prepares for its mission to the International Space Station. Closeouts are also continuing. Atlantis is scheduled to roll from the processing facility to the Vehicle Assembly Building in mid-July.

Technicians are testing the Orbiter Maneuvering System and Forward Reaction Control System and will begin cleaning the payload bay next week. The third redesigned External Tank (ET-119) should be shipped from the Michoud Assembly Facility in New Orleans on June 9th, arriving about five days later. ET-119 might fly with Atlantis on its mission.

FMI: www.nasa.gov/returntoflight

Advertisement

More News

Aero-News: Quote of the Day (10.16.25)

“This integration marks a significant step forward in cockpit connectivity and safety. It is one of few solutions offered to business aviation and rotorcraft operators that p>[...]

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

ANN's Daily Aero-Term (10.16.25): Enhanced Flight Vision System (EFVS)

Enhanced Flight Vision System (EFVS) An EFVS is an installed aircraft system which uses an electronic means to provide a display of the forward external scene topography (the natur>[...]

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 True Blue Power Unveils 50 Amp-hour Lithium-ion, Main Ship Battery >[...]

NTSB Final Report: Bellanca 17-30A

Shortly After Takeoff, The Engine Completely Lost Power Analysis: The pilot reported that the engine start, run-up, and takeoff were without incident. However, shortly after takeof>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC