GE Assigned Maintenance Role For Systems On F-35 Aircraft In Australia | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.17.25

AirborneUnlimited-07.11.25

Sat, Nov 12, 2016

GE Assigned Maintenance Role For Systems On F-35 Aircraft In Australia

RAAF Has Agreed To Purchase 72 Of The Fifth-Generation Fighters

The U.S. Department of Defense, F-35 Joint Program Office has selected the companies that will provide global maintenance, repair, overhaul and upgrade (MRO&U) assignment for selected aircraft systems fitted to the aircraft. Ahead of a competitive field, Australian companies have been selected to undertake the majority of component repairs for the Pacific region from next decade. Australia will serve as the repair and maintenance hub for the Pacific region.

GE has teamed with BAE Systems and Northrop Grumman in Australia to provide MRO&U services across a broad range of systems, which will support F-35 aircraft operating in the Pacific region. GE has been assigned the role of industry lead for the F-35 electrical power systems.

“This is an exciting opportunity and a great win for Australia when you consider that we are one of only four countries around the world selected to perform the work.” said Geoff Culbert, President and Chief Executive Officer, GE Australia, New Zealand & PNG. “This further strengthens Australia’s aviation sector and is evidence of the expertise across the industry here.”

The RAAF has committed to purchasing 72 F-35A, with the first aircraft arriving in Australia in late 2018. Japan has committed to purchasing 42 aircraft, and South Korea committed to 40 aircraft.

(Source: GE Aviation news release. Image from file)

FMI: www.geaviation.com

Advertisement

More News

ANN's Daily Aero-Term (07.15.25): Charted Visual Flight Procedure Approach

Charted Visual Flight Procedure Approach An approach conducted while operating on an instrument flight rules (IFR) flight plan which authorizes the pilot of an aircraft to proceed >[...]

Aero-News: Quote of the Day (07.15.25)

“When l became the Secretary of Defense, I committed to rebuild our military to match threats to capabilities. Drones are the biggest battlefield innovation in a generation, >[...]

ANN's Daily Aero-Linx (07.15.25)

Aero Linx: Stearman Restorers Association Welcome to the Stearman Restorers Association. The Stearman Restorers Association is an independent “Not for Profit” 501C-3 Co>[...]

NTSB Final Report: Kjelsrud Gary Kitfox

Airplane Exhibited A Partial Loss Of Engine Power When It Was About Halfway Down The Runway Analysis: The pilot of the experimental amateur-built airplane was departing from his pr>[...]

NTSB Prelim: Cessna A150L

The Flight Path Was Consistent With Low-Altitude Maneuvering On June 18, 2025, about 0922 mountain standard time, a Cessna A150L airplane, N6436F, was substantially damaged when it>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC