New European External ISS Platform Bartolomeo Headed To Space | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Fri, Mar 30, 2018

New European External ISS Platform Bartolomeo Headed To Space

Will Become First High Capacity Space-To-Ground Laser Communications System For The Station

The first high capacity space-to-ground laser communication system is to be installed on the Bartolomeo platform of the International Space Station (ISS) as part of a collaboration between Airbus Defence and Space, the Institute of Communications and Navigation of DLR (German Aerospace Center) and Tesat-Spacecom GmbH & Co. KG. The system called OSIRIS will provide direct to earth (DTE) technology with a data rate of 10 Gbps over range of about 1,000 miles.

Small size and lightweight, OSIRIS will directly link to several ground stations providing unparalleled data downlink capacity to Bartolomeo and its experimental payloads. The goal is to make OSIRIS an operational system embedded in the ISS infrastructure. This new European capability will enhance the utilization opportunities on the European Columbus module and make Bartolomeo the go-to platform for data-intensive payloads on the ISS.

”Laser communications using Bartolomeo will pave the way for digitalisation of ISS operations enabling direct access to huge volumes of data to benefit customers,” said Oliver Juckenhöfel, Head of On-Orbit Services and Exploration at Airbus.

Airbus is developing “Bartolomeo”, the new European external payload platform on the ISS, a commercial partnership between ESA and Airbus. The platform hardware is in development at Airbus' Bremen site and is currently undergoing a design review with the European Space Agency and NASA. Bartolomeo will be operated by Airbus and attached to the outside of the Columbus European module ready for commercial operations from 2019. Bartolomeo will be able to host a wide range of different payloads e.g. for Earth Observation or in-orbit validation and demonstration.

DLR and Tesat-Spacecom have entered into a long-term cooperation regarding research, development and industrialization of systems for optical space-to-ground links.

DLR’s novel design, optimized for high performance, small size and low complexity, combined with Tesat’s long-term in orbit experience of laser communications, have resulted in OSIRIS having very high data rates and an affordable price point.

(Image provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

Airborne 11.05.25: Tesla Flying Car?, Jepp/ForeFlight Sold, A220 Troubles

Also: AFE25 Tickets!, Jamaica Recovery, E-Aircraft at Boeing Fld, Diamond DA50 RG Cert Elon Musk is once again promising the impossible…this time, in the form of a Tesla tha>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

NTSB Prelim: Cirrus Design Corp SR22

While Descending Toward ASN, He Advanced The Throttle, But The Engine Did Not Respond On October 2, 2025, at 1126 central daylight time, a Cirrus SR22, N812SE, was substantially da>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC