Orbital ATK Awarded $48 M Rocket Motor Sustainment Contract By MDA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Jul 18, 2017

Orbital ATK Awarded $48 M Rocket Motor Sustainment Contract By MDA

Company To Provide Aging And Surveillance Support On Solid Rocket Motor Inventory

Orbital ATK has been awarded a follow-on Rocket Motor Technical Services (RMTS) contract from the U.S. Missile Defense Agency (MDA) Targets and Countermeasures Directorate. Under the contract, Orbital ATK will primarily support MDA in the sustainment of Trident I (C4) and Orion motors for use in MDA targets and interceptor vehicles. Orbital ATK also provides services for CASTOR, Orbus 1A and Oriole motors as well as various specialty support services such as radar signature testing and specialty tooling.

“Orbital ATK has more than 50 years of demonstrated performance providing aging and surveillance support of strategic motors for MDA, the Air Force and the Navy,” said Charlie Precourt, Vice President and General Manager of Orbital ATK’s Propulsion Systems Division. “As such, our world’s leading solid rocket motor expertise is helping ensure reliability and mission success for our customer.”

Under the RMTS contract, Orbital ATK will provide sustaining engineering, aging and surveillance testing and analysis, motor logistics, motor storage, motor disposal, static test support and flight test motor preparations for a five-year period. Target vehicles using C4 motors are on MDA’s flight manifest through the mid-2020s. Orion motors are used on both target vehicles and the Ground-Based Interceptor vehicle for the foreseeable future.

The majority of the work for this contract will be conducted at Orbital ATK’s Bacchus facility in Magna, Utah, with support as needed from several other Orbital ATK facilities across the country.

(Image provided with Orbital ATK news release)

FMI: www.orbitalatk.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC