Austro Engine AE300 Receives EASA Certificate For 1,800 Hour TBO | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Apr 25, 2015

Austro Engine AE300 Receives EASA Certificate For 1,800 Hour TBO

Powerplant Has Accumulated More Than 500,000 Flight Hours

EASA has certified a Time Between Overhaul (TBO) increase for Austro Engine's AE300 engine to 1,800 hours. The 170hp AE300 is Austro Engine’s leading Jet A1 piston engine in General Aviation. More than 500,000 flight hours have proven the powerplant’s reliability and endurance, the highest performance and efficiency compared to other products in this field.

“Having reached a TBO of 1,800 hours sets entirely new market standards in terms of operational efficiency and directly reflects the high reliability of the engine," said Jürgen Heinrich, Austro Engine CEO. "This milestone may be inferred to long-term meticulous efforts of Austro Engine’s engineering as well as the passionate work of the entire fleet support structure and lead customers.”

At equal power the engine has a 45% lower fuel burn than conventional piston aircraft engines running on AvGas. It produces significantly less exhaust emissions and is exceptionally silent. Mean time between failure exceeds by far the standard of general aviation piston engines.

FMI: http://austroengine.at

Advertisement

More News

NBAA Responds To GA/BA Operational Restrictions

Bolen Issues Statement Reinforcing Need To Reopen Government The National Business Aviation Association’s President and CEO issued the statement below in response to further >[...]

Boeing Deliveries Surge to Pre-Pandemic Levels

Output May Reach Its Best Since 2018 Despite Trailing Behind Airbus Boeing delivered 53 jets in October, bringing its 2025 total to 493 aircraft and marking its strongest output si>[...]

Spirit Forecasts Financial Turbulence

Low-Cost Airline Admits “Substantial Doubt” It Can Stay Airborne Spirit Airlines has once again found itself in financial trouble, this time less than a year after clai>[...]

Singapore Adds a Price Tag to Going Green

Travelers Leaving Changi Will Soon Pay for Sustainable Fuel Starting April 2026, passengers flying out of Singapore will find a new fee tucked into their tickets: a Sustainable Avi>[...]

NTSB Final Report: Arlie L Raber III Challenger 1

Pilot Was Having Difficulty Controlling The Airplane’S Rudder Pedals Due To His Physical Stature Analysis: The pilot was having difficulty controlling the airplane’s ru>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC