Ariane Moves Closer To Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, May 25, 2003

Ariane Moves Closer To Launch

Spacecraft Moved To Final Assembly Building

The Ariane 5 for Flight 161 took one big step closer to liftoff today when it was transferred from the integration building to the final assembly facility at the Spaceport's ELA-3 launch complex.

In a process that began at 10:30 a.m., the Ariane 5 emerged from the integration building atop its mobile launch table - which was pulled by the Spaceport's multipurpose tug.

It covered the 1.3 km. distance to the final assembly building under a bright sun and only partly cloudy skies overhead.

Flight 161's launcher has been in the integration building since April 25, when the vehicle began its assembly process with the erection of the cryogenic core central stage.

In successive steps, the central stage was mated with the two solid boosters, followed by the integration of Ariane 5's vehicle equipment bay and its EPS upper stage.

With Ariane 5 in the final assembly building, the launch campaign now enters the final stage, which includes integration of the dual satellite payload and the payload fairing.

Liftoff of Flight 161 remains on schedule for early June with the Optus and Defence C1 spacecraft for Australia, and BSAT-2c for the Broadcasting Satellite System Corporation (B-SAT) of Japan.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC