NTSB Denies Petition On 1996 Crash Of TWA Flight 800 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.11.24

Airborne-NextGen-11.12.24

Airborne-Unlimited-11.13.24

Airborne-FlightTraining-11.07.24

Airborne-Unlimited-11.08.24

Thu, Jul 03, 2014

NTSB Denies Petition On 1996 Crash Of TWA Flight 800

Says Petitioners Did Not Present Evidence To Show The Initial Findings Were Incorrect

The NTSB has denied a petition for reconsideration of its findings in the investigation of the 1996 crash of TWA flight 800. The petition was filed in June 2013 by a group called The TWA 800 Project. Petitioners claimed a “detonation or high-velocity explosion” caused the crash.

“Our investigations are never ‘closed’,” said Acting Chairman Christopher A. Hart. “We always remain open to the presentation of new evidence.”

Before responding to the petition, NTSB staff met with the petitioners’ representatives and listened to an eyewitness who described what he saw on the night of the accident. After a thorough review of all the information provided by the petitioners, the NTSB denied the petition in its entirety because the evidence and analysis presented did not show the original findings were incorrect.

To consider the petition, the NTSB assembled a team of investigators not previously involved with the original investigation.

(NTSB image)

FMI: http://twa800.sites.usa.gov/

Advertisement

More News

Airborne 11.13.24: Aeroflot Parking Tkt!, DB Cooper Conference, Airliner Gunfire

Also: FAA v Int'l Jumpers, Unleaded AvGas, Autonomous Blackhawk, Wally Funk! In an apparent case of poor timing, or poor planning, an Aeroflot Airbus A320 was finally able to depar>[...]

ANN's Daily Aero-Term (11.10.24): Airspace Flow Program (AFP)

Airspace Flow Program (AFP) AFP is a Traffic Management (TM) process administered by the Air Traffic Control System Command Center (ATCSCC) where aircraft are assigned an Expect De>[...]

Aero-News: Quote of the Day (11.10.24)

“These advantages will enable the Israeli Air Force to maintain its strategic superiority in addressing current and future challenges in the Middle East. This procurement mar>[...]

Aero-News: Quote of the Day (11.11.24)

“The first phase of the engine tests was really a warmup to make sure that everything looked good prior to running the engine. Then we moved to the actual first engine start.>[...]

ANN's Daily Aero-Linx (11.11.24)

Aero Linx: Associated Body of the European Civil Aviation Conference (ECAC) JAA Training Organisation (JAA TO) is the European Training Centre of Excellence (TCE) recognised by the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC