US Navy's P-8A Poseidon System Enhancements Add Mission Capabilities | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Feb 18, 2015

US Navy's P-8A Poseidon System Enhancements Add Mission Capabilities

Raytheon Awarded A $15.5 Million Contract For Open Architecture Development

The US Navy has awarded a $15.5 million system development contract to Raytheon Company to develop a flexible, application-based architecture (ABA) for the P-8A Poseidon maritime patrol aircraft. The ABA will allow mission commanders to rapidly field new or enhanced capabilities through third-party software applications.

Raytheon's ABA design aligns with both the Department of Defense's "Better Buying Power Initiatives" and the Navy's move towards open system architecture.

"The goal is to use readily available technology to quickly upgrade the P-8A's warfighting capability," said Jerry Powlen, Raytheon Space and Airborne Systems' vice president of Intelligence, Surveillance and Reconnaissance Systems.

Raytheon will deliver two prototype ABA systems, leveraging unique expertise in:

  • Airborne COTS computing;
  • Services-Oriented Architecture and Infrastructure; and
  • Software-based mission applications.

"This open systems architecture can easily be used for other domestic and international customers looking to affordably enhance their airborne platforms," Powlen said.

The work will be performed in McKinney, Texas, and completed by March 2017. The contract positions Raytheon for the engineering and manufacturing development phase scheduled for 2017.

(Image from file)

FMI: www.raytheon.com

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC