Electronic Flight Strip System Goes Into Operation At UK's Jersey Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneNextGen-
10.21.25

Airborne-Unlimited-10.22.25

Airborne-FltTraining-10.23.25

AirborneUnlimited-10.17.25

Mon, Mar 28, 2011

Electronic Flight Strip System Goes Into Operation At UK's Jersey Airport

Northrop Grumman Traffic Management System Replaces Paper Strips

An Electronic Flight Strip (EFS) system is now operational at Jersey Airport, Channel Islands, UK. In December 2010, Jersey Airport's new control tower and approach center became fully operational. Northrop Grumman Park Air Systems provided the EFS system under a subcontract to the UK's National Air Traffic Services (NATS). The EFS system automates the production, distribution and administrative management of flight plan information and other air traffic control data and replaces the paper strip systems previously used by air traffic controllers.

"Our integrated air traffic management system will help controllers meet the demands for increased airspace capacity at Jersey airport," said Eldar Hauge, managing director for Northrop Grumman Park Air Systems Norway. "We are proud of our strong partnership with NATS and delighted that our products were selected for the tower fit-out at Jersey Airport and that they are now in operation."

The EFS also provides data integrity checking, eases the working environment of air traffic controllers and paves the way for the application of advanced features such as Controller Pilot Data Link Communications. The system installed at Jersey exchanges data via standard links with both the enroute centers at Swanwick in the UK and Brest in France, as well as a data link to Guernsey.

"The project faced considerable challenges in delivering EFS for tower, approach and zone facilities in conjunction with moving the Jersey air traffic control center to a new facility," said Derek Brien, NATS Manager Special Projects for Jersey Airport. "The success of the project is testament to the dedication of the entire project team, specifically both customer and supplier in identifying requirements and solutions throughout the project cycle."

FMI: www.northropgrumman.com

Advertisement

More News

Affordable Flying Expo Announces Industry MOSAIC Town Hall

Scheduled for Friday, November 7th at 1800ET, The MOSAIC Town Hall, Webcast At www.airborne-live.net One of the more intriguing features of the 2025 Affordable Flying Expo, schedul>[...]

Classic Aero-TV: Composite-FX Sets Elevates the Personal Helicopter Market

From 2023 (YouTube Edition): The Mosquito Evolves Formerly known as Mosquito, Trenton, Florida-based Composite FX is a designer and manufacturer of personal kit and factory-finishe>[...]

Aero-News: Quote of the Day (10.25.25)

“The Board is pleased to name Lisa as our next CEO after conducting a comprehensive succession planning process and believes this transition will ensure continued success for>[...]

ANN's Daily Aero-Term (10.25.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

NTSB Final Report: Gallow Daniel A Kitfox Classic IV

The Airplane Stalled Above The Runway Threshold, The Nose Dropped, The Nose Wheel Impacted The Runway, And The Airplane Flipped Over Analysis: The pilot reported that during the fi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC