DOD Details VXX Work Split Locations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Jan 30, 2005

DOD Details VXX Work Split Locations

Over A Third Of The Work To Be Performed Outside The United States

The Department of Defense has issued a statement detailing the amount of work that will be performed on the Lockheed-Martin VXX presidential helicopter replacement, by city, state and country.

The Systems Development and Demonstration phase of the contract, which ANN previously reported totalled just under $1.8 billion, consists of engineering design and integration work for the myriad communications, navigation and mission systems required to perform the support mission for the President of the United States.

The phase also includes a comprehensive test and evaluation program, and production of five aircraft to introduce the operational capability. The locations where the SDD work will be performed, and the percentage of work assigned to each, are:

  • Owego (NY), 31 percent
  • Amarillo (TX), 27 percent
  • Yeovil, United Kingdom, 21 percent
  • Agusta, Cascina Costa, Italy, 15 percent
  • Lynn (MA), 3 percent
  • Rancho Santa Margarita (CA), 1 percent
  • Grand Rapids (MI), 1 percent
  • Denton (TX), 1 percent

The SDD phase is expected to be completed by September 2011, and the contract funds for the program will not expire at the end of this fiscal year. The contracting activity for this program is the Naval Air Systems Command, Patuxent River (MD).

FMI: www.dod.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC