NASA Aims For January 10 Launch Date For Atlantis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Dec 14, 2007

NASA Aims For January 10 Launch Date For Atlantis

Wants Workers To Have Time With Their Families

NASA's Space Shuttle Program managers have targeted January 10 for the launch of shuttle Atlantis' STS-122 mission to the International Space Station.

"The workforce has stepped up to and met every challenge this year," said Wayne Hale, Space Shuttle Program manager at NASA's Johnson Space Center. "Moving the next launch attempt of Atlantis to January 10 will allow as many people as possible to have time with family and friends at the time of year when it means the most. A lot has been asked of them this year and a lot will be asked of them in 2008."

The liftoff date from NASA's Kennedy Space Center, FL depends on the resolution of a problem in a fuel sensor system. The shuttle's planned launches on December 6 and December 9 were postponed because of false readings from the part of the system that monitors the liquid hydrogen section of the tank.

As ANN reported, NASA plans an on-pad test Tuesday to test the engine cutoff (ECO) sensor system, by pumping super-cold liquid hydrogen into the external fuel tank.

Atlantis' main objective during its STS-122 mission to the International Space Station is to install and activate the European Space Agency's Columbus laboratory, which will provide scientists around the world the ability to conduct a variety of life, physical and materials science experiments.

FMI: www.nasa.gov/shuttle

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC