NASA Aims For January 10 Launch Date For Atlantis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Dec 14, 2007

NASA Aims For January 10 Launch Date For Atlantis

Wants Workers To Have Time With Their Families

NASA's Space Shuttle Program managers have targeted January 10 for the launch of shuttle Atlantis' STS-122 mission to the International Space Station.

"The workforce has stepped up to and met every challenge this year," said Wayne Hale, Space Shuttle Program manager at NASA's Johnson Space Center. "Moving the next launch attempt of Atlantis to January 10 will allow as many people as possible to have time with family and friends at the time of year when it means the most. A lot has been asked of them this year and a lot will be asked of them in 2008."

The liftoff date from NASA's Kennedy Space Center, FL depends on the resolution of a problem in a fuel sensor system. The shuttle's planned launches on December 6 and December 9 were postponed because of false readings from the part of the system that monitors the liquid hydrogen section of the tank.

As ANN reported, NASA plans an on-pad test Tuesday to test the engine cutoff (ECO) sensor system, by pumping super-cold liquid hydrogen into the external fuel tank.

Atlantis' main objective during its STS-122 mission to the International Space Station is to install and activate the European Space Agency's Columbus laboratory, which will provide scientists around the world the ability to conduct a variety of life, physical and materials science experiments.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC