NASA Continues With Discovery Repairs, Sunday Launch Still Possible | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Mar 13, 2009

NASA Continues With Discovery Repairs, Sunday Launch Still Possible

Weather Forecast Is Good For Twilight Liftoff At 7:43 pm EDT

NASA says repairs are under way on the Ground Umbilical Carrier Plate (GUCP) interface, where gaseous hydrogen leaked during Wednesday's launch attempt of the space shuttle Discovery.

Once repairs are completed, the interface will be retested and leak checked before Sunday's planned launch attempt at 7:43 pm.

The Mission Management Team will meet on Saturday at 1 pm to review the data and the progress of the teams, and make a final determination on the launch. A Prelaunch News Conference will be held following the MMT to announce whether the countdown will proceed towards T-minus zero Sunday evening.

The weather forecast calls for an 80 percent chance of acceptable conditions at launch time, though Shuttle Weather Officer Kathy Winters says meteorologists are watching for low cloud ceilings.

As far as weather conditions go, Sunday represents the last best chance for NASA to launch Discovery before the forecast deteriorates at the start of the week.
The STS-119 mission would last 13 days if Discovery launches Sunday; if launched later, that timeline could be compromised.

As ANN reported, NASA discovered a potentially catastrophic hydrogen leak while fueling the orbiter Wednesday morning. The leak developed on the piping that runs from the fixed service structure to a valve at the intertank section of the shuttle's external tank. The pipe moves hydrogen gas away from the shuttle and to a flare stack near the launch pad that burns it away safely.

Originally scheduled to liftoff February 12, Discovery was grounded for a month as NASA examined hydrogen flow control valves linking the external tank to the orbiter. One of those valves was found cracked after Endeavour returned from its mission in November; NASA opted to swap the valves originally installed on Discovery, with lower-time parts.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Aero-News: Quote of the Day (12.09.25)

“We respectfully call on the City of Mesa to: 1. Withdraw the landing fee proposal immediately 2. Engage with the aviation community before making decisions that impact safet>[...]

ANN's Daily Aero-Term (12.09.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.09.25)

Aero Linx: International Federation of Airworthiness (IFA) IFA uniquely combines together all those with responsibility for policies, principles and practices concerned with the co>[...]

NTSB Final Report: Diamond Aircraft Ind Inc DA20C1 (A1); Robinson Helicopter R44

Controller’s Expectation That VW02 Would Have Departed Sooner Led To An Inadequate Scan And Loss Of Situational Awareness Analysis: A Robinson R-44 helicopter N744AF, VW02 (V>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC