MQ-8C Fire Scout Completes Operational Assessment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Dec 05, 2015

MQ-8C Fire Scout Completes Operational Assessment

Completed Assessment Period Last Month At Point Magu Naval Base

The MQ-8C Fire Scout completed a three week operational assessment period Nov. 20 at Naval Base Ventura County at Point Mugu, California.

The OA included 11 flights totaling 83.4 flight hours where Fire Scout was tested against maritime and surveyed land targets to assess system performance, endurance and reliability of the unmanned helicopter.

“MQ-8C is meeting or exceeding its performance objectives and will deliver greater warfighting capabilities to the fleet in the future,” said Capt Jeff Dodge , Fire Scout’s program manager for Multi-Mission Tactical Unmanned Aerial Systems.

The MQ-8C will provide twice the endurance and three times the payload as the existing MQ-8B.  It has a range of 150 nautical miles and a payload capacity of more than 700 pounds which provides unique situational awareness and precision target support for the Navy on land and at-sea with its multiple intelligence, surveillance and reconnaissance (ISR) capabilities.

The smaller MQ-8B, currently deployed on the USS Fort Worth (LCS-3), has flown more than 16,000 hours and demonstrated the ability to operate alongside the MH-60 manned helicopter during ship-based operations.

“The C model will greatly impact how we monitor, understand and control the sea and air space around small surface combatants,” Dodge said.

The MQ-8C has logged 427 flights and more than 730 flight hours to date.  Initial ship-based testing is scheduled to begin in fiscal year 2017.

(Image provided with NAVAIR news release)

FMI: www.navair.navy.mil

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC