FAA Approves Eclipse Jet Extended Service Life | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Jun 07, 2013

FAA Approves Eclipse Jet Extended Service Life

Company Says The Jet Should Fly For Over 50 Years

The FAA has approved the extension of the service life of the Eclipse 500 & 550 aircraft to 20,000 hours / 20,000 cycles with unlimited calendar life. This provides the typical Eclipse Jet owner with over 50 years of safe operation.

The announcement was made Thursday at an Eclipse Aerospace Customer Event, held at the Albuquerque production facility. "Once again, Eclipse has delivered on our commitment to our customers. To reach this goal, Eclipse invested hundreds of hours and several million dollars into this project. An actual Eclipse Jet was subject to the movements, loads, and fatigue that would normally be experienced over more than 60,000 flight operations. This testing also validated the strength and superiority of our patented Friction Stir Welding process," said Cary Winter, SVP of Engineering, Manufacturing, and Technical Operations.

Friction Stir Welding (FSW) is the cornerstone of Eclipse's success in improving airframe strength. The FSW process, which is unique in aviation to Eclipse Aerospace, replaces the requirement to manually drill holes and install over 7,000 rivets in the airframe. Because rivet holes create opportunities for stress cracks to form, the elimination of rivet holes and the strength provided by the FSW welded joint provides an airframe that is three times stronger than a traditional riveted airframe. This added structural strength in the Eclipse Jet airframe results in a longer life and safer aircraft for EAI customers.

An aircraft's service life is based on a combination of pressurization cycles, the aerodynamic loads experienced in flight, and landing loads. Each time an aircraft is flown, its fuselage and wings are subject to various stresses. Aircraft manufacturers anticipate these loads and design the aircraft to safely operate well beyond its established service life. This approach assures that the aircraft will provide safe, carefree service throughout its life.

While every Eclipse 550 will be delivered with a 20,000 hour / 20,000 cycle airframe, this life extension will also apply to the previously manufactured Eclipse 500 aircraft. "When we started Eclipse Aerospace, we made a commitment to support our customers. This airframe life extension is yet another fulfillment of that commitment," said Mason Holland, CEO of Eclipse Aerospace. "We have great customers who have been very loyal and supportive of EAI and we want to thank them for sharing this journey back to production by offering them the opportunity to have their Eclipse aircraft participate in this life extension program at no additional cost."

FMI: www.eclipse.aero

Advertisement

More News

NTSB Final Report: Cozy Cub

Witness Reported The Airplane Was Flying Low And Was In A Left Bank When It Struck The Power Line Analysis: The pilot was on final approach to land when the airplane collided with >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Seated On The Edge Of Forever -- A PPC's Bird's Eye View

From 2012 (YouTube Edition): A Segment Of The Sport Aviation World That Truly Lives "Low And Slow" Pity the life of ANN's Chief videographer, Nathan Cremisino... shoot the most exc>[...]

ANN's Daily Aero-Linx (04.29.25)

Aero Linx: International Business Aviation Council (IBAC) IBAC promotes the growth of business aviation, benefiting all sectors of its industry and in all regions of the world. As >[...]

ANN's Daily Aero-Term (04.29.25): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC