Officials Propose New Airport In Livingston Parish, LA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Aug 22, 2012

Officials Propose New Airport In Livingston Parish, LA

New GA Facility 'Highly Feasible' According To Study

Officials in Livingston Parish, LA, are in discussions with state and federal officials about the possibility of constructing an new GA airport in their community.  And out of the box, a study by the consulting firm LJC Poole calls the potential for getting the airport built is "highly feasible."

The newspaper The Advocate reports that a request for the inclusion of the proposed airport in the Louisiana Airport System Plan has been sent in writing to the state by parish president Layton Ricks. The consultant has also contacted the FAA about potential sites for the airfield.

The study shows that the airport could be built on as little as 200 acres, but 500 acres would be the optimal amount of land. The planned 5,400 foot runway would accommodate GA airplanes and some business jets, but not commercial air traffic. The runway is planned for a north-south orientations as prevailing winds are from the south, according to the study.

It is estimated that the project would cost about $12 million, with 90 percent funded through federal AIP and other grants. Parish councilwoman Sonya Collins told the paper that outside funding would be critical to the feasibility of building an airport at this time. Bobby Font, the mayor of Walker, LA, said that the number of airplanes in the parish will make it necessary to build such a facility "at some point" to move the parish forward in terms of development. But "I don't know if that time is now or not," he said.

While there are many hurdles to clear before the first dirt can be turned on the new airport, Ricks said he thinks it would be good for attracting business to the area. “A lot of businesses like the opportunity to fly right in” with key people or important parts, he said.

FMI: www.livingstonparishla.gov, www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC