Aero-TV: 'The Worst Rule Making' -- AEA's Ric Peri On The Part 145 Proposal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Nov 08, 2012

Aero-TV: 'The Worst Rule Making' -- AEA's Ric Peri On The Part 145 Proposal

The Worst Proposal He's Seen, AEA's Washington Expert Warns About The Perils Of The Part 145 Re-Write

We've devoted a lot of verbiage to the topic... but as more and more of the details of FAA's current Part 145 proposal emerge, we're wondering if we've underplayed it. Short and sweet, the current version of FAA's part 145 Rule-Making is just plain bad news.

For instance... The rule proposes a 24-month transition period to reissue new certificates, and there is no implementation period. With the current lack of FAA workforce and sequestration initiatives, how will the agency approve and reissue certifications to 4,000 repair stations in a 24-month period? Without the FAA's ability to service an application in a timely manner, businesses will close.
 
Contrary to the FAA's claim, this proposal does not reflect current repair station aircraft maintenance and business practices, or advances in aircraft technology. It simply does not recognize avionics as a profession. These changes would not modernize the regulations to keep pace with current industry standards and practices. Rather, they would roll modern aviation back to the days of round motors and tube radios from the 1930s.
 
The AEA has received second-hand information that various user groups, as well as certain FAA inspectors, have incorrectly assumed and promoted that the Part 145 NPRM proposal only applies to repair stations that cater to Part 121 air carriers. This is not true and is disturbing. This proposal applies to all repair stations regardless of its customer bases.

There's more... but we'll let AEA's Peri fill you in, on the subject, better than anyone we know...

Copyright 2012, Aero-News Network, Inc., All Rights Reserved.

FMI: www.aea.net, www.aea.net/part145, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

 


Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC