Bombardier Says It's Moving Closer to CSeries Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Nov 13, 2014

Bombardier Says It's Moving Closer to CSeries Certification

FTV1 Is Being Repaired, Other Flight Test Aircraft In Full Operation

In a video released to the media and others, Bombardier says its CSeries flight test program is moving forward towards certification of the airplane.

In the video, Robert Dewar, Bombardier's Vice President for the CSeries CS100 program, says that FTV1, the airplane that had an engine incident, "is being repaired." He said that the repair process is "a good validation of the technology" of the carbon-fiber wing structure. "The repair went very well," he said.

FTV2 has returned to flight, Dewar said, and is "performing exceptionally well."  He said the fly-by-wire technology is performing as expected in the airplane.

FTV4 is also making good progress. This is the airplane that is being used to evaluate aircraft performance. Dewar said that the anti-skid tuning system is being completed in Salina, KS, and the final performance engines have been received. He said that they are working on getting the final performance data for the airplane.

The first interior has been installed on FTV5, Dewar said.

As for the CS300, "it's powered on, painted, engines are installed, and we're getting this aircraft ready to enter the flight test program."

Finally on the ground testing side, "all the structural testing is going well. We're actually on track to finish all the testing this year." Dewar said that the fatigue article has undergone over 7,000 flight cycles.

He said that with the flight test program back underway, the company is now looking forward to entry into service for the new airliner.

(Image from YouTube video)

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC