Bell Validates Folding Rotor In Wind Tunnel Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Dec 07, 2024

Bell Validates Folding Rotor In Wind Tunnel Testing

System Combines Jet Speeds With VTOL Capability

Bell Textron announced the completion of wind tunnel testing of its Stop/Fold folding rotor system at the National Institute for Aviation Research at Wichita State University.

This testing was in support of the DARPA Speed and Runway Independent Technology (SPRINT) program, and follows the successful evaluation of the rotor system using the Holloman High Speed Test Track in New Mexico in 2023.

Augmenting the previous testing, the wind tunnel program validated the stability and control of the aircraft through the rotor fold and unfold sequence in flight. The validation of those parameters show that the concept is ready to progress into a flight demonstration as part of the DARPA SPRINT program.

Jason Hurst, EVP of Engineering at Bell said, “After completing folding rotor transition testing on the sled at Holloman Air Force Base last year, we’re thrilled to have now completed this next phase of testing.

Bell’s advanced Stop/Fold family of systems will revolutionize the speed, range and survivability of vertical lift aircraft to enable operations in contested environments. We are excited to be part of another aviation milestone with this breakthrough technology.”

The SPRINT program is currently in its Phase 1B and its intention is to design, build, and fly an experimental aircraft (X Plane) to demonstrate the concepts and technology required for the transformational combination of aircraft speed and runway independence for the next generation of air mobility and air combat platforms.

FMI:  www.bellflight.com/

Advertisement

More News

Aero-News: Quote of the Day (12.18.25)

“These new aircraft strengthen our ability to respond quickly, train effectively and support communities nationwide. Textron Aviation has been a steadfast supporter in helpin>[...]

Classic Aero-TV: Viking Twin Otter 400--Bringing the DHC-6 Back Into Production

From 2011 (YouTube Edition): Rugged, Legendary, STOL Twin Makes A Comeback The de Havilland Twin Otter is an airplane with a long history, and it gained a reputation as a workhorse>[...]

NTSB Final Report: Rans Employee Flying Club Rans S-6ES Coyote II

A Wind Gust Lifted The Right Wing And The Airplane Turned To The Left Analysis: The pilot was departing from a 2,395-ft-long by 50-ft-wide turf runway. The pilot reported that afte>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

ANN's Daily Aero-Term (12.18.25): Braking Action Advisories

Braking Action Advisories When tower controllers receive runway braking action reports which include the terms “medium," “poor," or “nil," or whenever weather con>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC