Bell Validates Folding Rotor In Wind Tunnel Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sat, Dec 07, 2024

Bell Validates Folding Rotor In Wind Tunnel Testing

System Combines Jet Speeds With VTOL Capability

Bell Textron announced the completion of wind tunnel testing of its Stop/Fold folding rotor system at the National Institute for Aviation Research at Wichita State University.

This testing was in support of the DARPA Speed and Runway Independent Technology (SPRINT) program, and follows the successful evaluation of the rotor system using the Holloman High Speed Test Track in New Mexico in 2023.

Augmenting the previous testing, the wind tunnel program validated the stability and control of the aircraft through the rotor fold and unfold sequence in flight. The validation of those parameters show that the concept is ready to progress into a flight demonstration as part of the DARPA SPRINT program.

Jason Hurst, EVP of Engineering at Bell said, “After completing folding rotor transition testing on the sled at Holloman Air Force Base last year, we’re thrilled to have now completed this next phase of testing.

Bell’s advanced Stop/Fold family of systems will revolutionize the speed, range and survivability of vertical lift aircraft to enable operations in contested environments. We are excited to be part of another aviation milestone with this breakthrough technology.”

The SPRINT program is currently in its Phase 1B and its intention is to design, build, and fly an experimental aircraft (X Plane) to demonstrate the concepts and technology required for the transformational combination of aircraft speed and runway independence for the next generation of air mobility and air combat platforms.

FMI:  www.bellflight.com/

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC