UAVOS Tests New Two-Stage Parachute System For UAS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.21.25

Airborne-NextGen-04.22.25

AirborneUnlimited-04.23.25

Airborne-FltTraining-04.24.25

AirborneUnlimited-04.25.25

Fri, May 01, 2020

UAVOS Tests New Two-Stage Parachute System For UAS

Designed To Help UAS Traveling At High Speeds

UAVOS has successfully tested its new two-stage parachute system, which is designed to help UAS traveling at high speeds slowly descend to the ground.

The system includes two parachutes: the pilot chute and the main chute used to slow and stabilize the UAS. The pilot chute allows the UAS to slowly descend safely during the main parachute deployment. It also allows the main chute to open up at a minimum altitude.

After the pilot chute opens, the main chute’s opening delay function causes the decrease in the load speed on the UAS. UAVOS says that the parachute system is designed for UAS that can travel at speeds of up to 280 miles per hour, and that weigh up to 110 pounds.

“In the aircraft safety developments, saving an entire aircraft through a deployable parachute system is a crucial thing,” says Aliaksei Stratsilatau, CEO and lead developer of UAVOS.

“These trials have generated an amount of data which allows us to quantify the performance of parachute system for future missions. Computer modeling cannot capture all the complexities. Parachutes encounter turbulent and dynamic airflow, which is almost impossible to replicate with computers. The only way to get a handle on all the possibilities is test.”

After landing, the group of the main parachute lines is automatically unfastened to collapse the canopy of the main chute and releases after touchdown to avoid the UAS being dragged along the ground.

Unfastening is carried out by the lock of a three-step release. During the first stage, the pilot chute is opened. During the second stage, the main chute is opened. During the third and final stage, the group of lines of the main parachute is released.

FMI: www.uavos.com

Advertisement

More News

Aero-News: Quote of the Day (04.27.25)

“Our company is moving in the right direction as we start to see improved operational performance across our businesses from our ongoing focus on safety and quality. We conti>[...]

ANN's Daily Aero-Linx (04.27.25)

Aero Linx: International Committee for Airspace Standards and Calibration (ICASC) The International Committee for Airspace Standards and Calibration (ICASC) was created following t>[...]

Classic Aero-TV: Veteran's Airlift Command -- Serving Those Who Served

From 2013 (YouTube Edition): One Of Aviation's Most Positive Efforts... The VAC!!! In all the doddering, misleading, anti-aviation blather we've had to deal with over the last few >[...]

Airborne-NextGen 04.22.25: NYC eVTOL Network, ForgeStar-1, Drone Safety Day

Also: CiES Documents, Hypersonic Tech, SKYTRAC Health Monitoring, Skyryse Archer Aviation announced a blueprint for an eVTOL network in New York City that would connect travelers b>[...]

Airborne 04.21.25: Charter Bust, VeriJet Woes, Visual Approach Risks

Also: Sun Country CEO to Spirit, Indian AF Rafale Jets, Archer-United, Avflight Grows Federal prosecutors recently filed a lawsuit against an uncertified charter flight company and>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC