Bell's HSVTOL Program Proceeds Apace | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sun, Aug 11, 2024

Bell's HSVTOL Program Proceeds Apace

Army’s Black Hawk Tiltrotor Replacement Passes Development Milestone

While enthusiasm to replace the Army's Black Hawk helicopters with a high-speed tiltrotor may not be great news riding on the heels of a recently released V-22 Osprey accident report, the firm says they're making good headway on the Future Long Range Assault Aircraft, getting the US Army's Approval to move on to Milestone B.

"Milestone B" is a part of the 'Major Capability Acquisition process', and comes along after Bell and the Army "decompose requirements, reduce risk and inform the weapon system acquisition". Parsing that from bureaucratic parseltongue, the Bell team completed a Preliminary Design Review, checking that the FLRAA aircraft in its current design form would integrate with existing and prospective elements of the techno-ecosystem it will work in. Engines, electronics, weapon systems, and logistics are all important elements that could sink even the best performing design on paper, as many an orphaned DOD project could attest. Bell has gone all-in on the FLRAA contract, investing in 'several new state-of-the-art facilities and new innovative manufacturing processes to drive cost, schedule and performance to support the program’s execution.'

"This achievement marks a historic moment for both the U.S. Army and Bell,” said Ryan Ehinger, Bell’s Senior Vice President and Program Director, FLRAA program. “Now that the program has Milestone B approval, the course is set for delivering transformational capability to the warfighter. The FLRAA team remains laser-focused on working in tandem with the U.S. Army to execute the next phase of Engineering and Manufacturing Development.”

“This significant milestone is made possible by the years of hard work and sacrifice by Team FLRAA and our teammates throughout the Army and the Department of Defense,” added Jeffrey Poquette, FLRAA Project Manager. “We are poised to deliver a truly transformational aircraft for the Army. The hard work continues into the Engineering and Manufacturing Development Phase where we will design, build and test FLRAA prototypes. It is certainly an exciting time for the program.”

FMI: www.bellflight.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC