AAR Delivers First P-8A Poseidon To U.S. Navy Fleet | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, May 28, 2019

AAR Delivers First P-8A Poseidon To U.S. Navy Fleet

Completes First Planned Overhaul, Age Exploration And Planned Inspection

AAR has completed its first planned overhaul, age exploration and planned inspection of its first U.S. Navy P-8A Poseidon (P-8A) aircraft.

As part of a seven-year, indefinite-delivery/indefinite-quantity (IDIQ) contract signed last year with the Navy, AAR is providing heavy depot airframe maintenance, as well as year-round field support, for the U.S. fleet. The P-8A aircraft arrived at AAR for its first Age Exploration Plan Depot (AEPD) visit, which is part of a systematic, scheduled maintenance requirement.

"Delivering a mission-ready aircraft means executing a successful maintenance-repair plan. Many thanks to the AAR team for a job well done," said Capt. Tony Rossi, Program Manager for the NAVAIR's Maritime Patrol and Reconnaissance Program (PMA-290). "As expected, there have been no significant aircraft condition findings. The aircraft continues to fly anti-submarine and anti-surface warfare missions, humanitarian and search and rescue missions around the world, and it's performing well."

"Our team is honored to perform maintenance on the P-8A Poseidon for the U.S. Navy and ensure its operational-readiness for the warfighter," said William Patton, AAR P-8A Program Manager and 20-year U.S. Navy veteran. "With our vast experience in B737s and longstanding working relationship with military programs, AAR's P-8A Program has excelled in meeting strict government compliance standards and maintaining the quality of the aircraft."

In addition to the P-8A program, AAR has also performed service on the U.S. Navy's C-40, Clipper, Harrier Jet Sustainment, C-9 Nightingale and H60R fleets.

All of the maintenance for the P-8A Program is performed at AAR's Indianapolis facility, which has serviced over 2,000 B737 aircraft both for commercial and government customers.

(Image provided with AAR news release)

FMI: www.aarcorp.com
www.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC