New Mexico Spaceport Authority OKs Runway Extension | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Apr 02, 2012

New Mexico Spaceport Authority OKs Runway Extension

Two-Thousand Feet Will Be Added To The Nearly Two-Mile Runway

Spaceport America plans to extend its main runway by 2,000 feet to accommodate Virgin Galactic's SpaceShipTwo. The New Mexico Spaceport Authority Board approved the extension at its regular meeting Wednesday.

The move comes after Virgin Galactic conducted a series of test flights and simulations that led it to conclude that the additional runway length would be needed "under certain conditions."  Spaceport Spokesman David Wilson told the Associated Press that the extension was a safety concern. He said the landing charactaristics of SpaceShipTwo were "a guess until they started dropping it and simulating and doing different scenarios."

One such scenario would be a rocket misfire, in which the spacecraft would have to return to Earth heavy with a full load of fuel, which would require a longer landing roll The altitude and often high temperatures experienced at the desert spaceport also dictate longer runways.

The runway extension is estimated to cost about $7 million. Wilson said money would be moved around internally to accommodate the cost of the project. The Spaceport has a taxpayer-based budget of $209 million.

The design will take about six to eight months before construction could begin.

FMI: www.spaceportamerica.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC