Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, May 21, 2014

Runway Construction Nearly Complete At Kissimmee, FL Gateway Airport

Normal Operations Expected To Resume By June 6

The City of Kissimmee Gateway Airport announces that the construction on Runway 06/24 is coming to a close.  The construction is coming into its final phase, which will include cutting grooves into the new asphalt to improve braking action. While this work will take place during normal business hours during the week of May 29 thru June 1, there is a potential for noise and vibration to be encountered by those in close proximity to the airport.  The runway is expected to return to normal operations by Friday, June 6.

Runway 06/24 is only operated when strong winds blow out of the east or west, or when the main runway is closed for maintenance or aircraft emergencies, however these events can mean the runway is used continuously for several days at a time.
 
The $2.7 million dollar project, funded by the FAA, Florida Department of Transportation and Kissimmee Gateway Airport funds, was the first major resurfacing since the 1980’s, and the new LED airfield lights installed as part of the project will generate significant energy savings.

(Image provided by City of Kissimmee, FL)

FMI: www.kissimmeeairport.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC