Basrah International Airport Opens to Commercial Flights | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 18, 2005

Basrah International Airport Opens to Commercial Flights

After almost 20 years of sporadic flying and finally being grounded, the first Iraqi Airways flight landed at Basrah International Airport June 4 with the help of the U.S. Army Corps of Engineers Gulf Region South.

The Corps' goal is to give the Iraqis a functioning civil aviation airport that will allow planes with passengers to land and take off, both domestically and internationally, according to Robert Vanoer, resident engineer for the Basrah Resident Office, Gulf Region District South (GRS).

"The details the Corps is involved in are critical to the airport," said Vanoer. "The big piece is to ensure the terminal has air conditioning. Another big piece is the air control tower, which is 12 stories high and has no elevator. The British Army uses it for their physical training. There are other things that are in the works, such as the rehabilitation of the water treatment plant, which is critical to the chillers (air conditioning)."

The chillers need processed water, which is ultra clean, to run smoothly, according to Dan Drew, Project and Contracting Office (PCO) project manager for the airport project.

"These chillers weigh 1700 tons," said Drew, "and they feed a chilled water system in underground tunnels through the whole airport. One of the reasons they failed is because the water from the water treatment plant had scale in it - metallic particles - that ended up settling and clogging a lot of tubes and small orifices in the chiller units."

Drew said the water is also needed for fire protection, and that this water comes from a reservoir from the water treatment plant. Originally built in 1986, the plant, like many of the airport's facilities was never maintained and now needs refurbishment. "The airport was like a small city - self contained," he said. "So when one component failed, a lot of the systems were affected."

The next project, the second largest at the airport, involves the installation of Navigational and Visual Aids, according to Drew. The Navigational Aids contract, $28 million, was awarded to Raytheon and negotiations are continuing. The airport's radar equipment falls under this contract and the airport cannot receive International Civil Aviation Organization certification without it.

"Raytheon is the sole proprietor of this radar equipment," said Drew. "This will allow the airport to track all weather operations, such as fog and sandstorms. The Visual Aids are things like runway markings and lighting."

The Corps does the quality assurance and is overseeing the work being done, according to Vanoer. He said that once the prime contractor, Nana Pacific, Inc., hired its subcontractor, Carrier Corporation, a big air conditioning and ventilation manufacturer, whose agents are authorized in Baghdad, things began to roll.

"These people worked diligently and pulled double shifts," said Vanoer. "Right now they are waiting on parts, and when those parts come in, I have no doubt they'll finish the chillers on time, by July 2005."

Vanoer said parts of the original contracts are on schedule and that Iraqi Airways began flying after pressure from the ministry of transportation. They installed a split system air conditioner to provide some cool air and passengers are shuttled to the terminal from Baghdad. "I modified a contract to energize the departure and domestic ticket desk," he said. "And I had the baggage scales recalibrated. Now passengers can get their baggage and it is quite something to see."

Mr. Razek, airport director for 15 years, said he is excited about the changes and the fact that flights are now coming in and out of Basrah International Airport. "We have three flights a week, two each day," he said. "We fly from Basrah to Baghdad and then to Amman, Jordan and back. The flights are on Saturday, Monday and Wednesdays. People buy their tickets in downtown Basrah and are shuttled here to the airport."

There was one recent incident, he recalled, where a sandstorm forced the closing of Baghdad International Airport for two days. "A flight from Jordan flew directly here," he said. "We are the alternate airport for Baghdad and are truly now international. We look forward to having the entire airport back and to many more flights which will be cheaper for people. Right now, tickets are $75 to Baghdad, but we are looking for ways to bring the cost down. It is a very exciting time for us here in Basrah."

FMI: www.grd.usace.army.mil

Advertisement

More News

ANN's Daily Aero-Term (12.13.25): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (12.13.25)

“We have performed extensive ground testing by comparing warm up times, full power tethered pulls, and overall temperatures in 100 degree environments against other aircraft >[...]

NTSB Final Report: Gippsland GA-8

While Taxiing To Parking The Right Landing Gear Leg Collapsed, Resulting In Substantial Damage Analysis: The pilot made a normal approach with full flaps and landed on the runway. >[...]

Classic Aero-TV: Historically Unique -- Marlin Horst's Exquisite Fairchild 71

From 2014 (YouTube Edition): Exotic Rebuild Reveals Aerial Work Of Art During EAA AirVenture 2014, ANN's Michael Maya Charles took the time to get a history lesson about a great ai>[...]

Airborne 12.12.25: Global 8000, Korea Pilot Honors, AV-30 Update

Also: Project Talon, McFarlane Acquisition, Sky-Tec Service, JPL Earth Helo Tests Bombardier has earned a round of applause from the business aviation community, celebrating the fo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC