Volatus Embarks on Vertiport Project at Bellefonte Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sun, Feb 05, 2023

Volatus Embarks on Vertiport Project at Bellefonte Airport

1st of 8 Landing Pads and Charging Installations Operational by 2024

Volatus Infrastructure has reached an agreement with  Bellefonte Airport for the construction of a public use vertiport.

The public use airport is located in Centre County, Pennsylvania . Eventually, Bellefonte will see the installation of up to 8 landing pads for electric VTOL aircraft, each equipped with charging stations and the necessary infrastructure to support them. The first vertiport is expected to be operational later this year.

Volatus is picking up speed in the vertiport industry, owing to their modular design and scalable growth options. Airport management looking for quick on-site construction and scalable growth seem to find Volantus a prime partner to kickstart their AAM ambitions. In Bellefonte's case, they'll start with an initial, single-pad installation, with additional headroom for another 7 built in for rapid growth as use of the spot increases.

“A project that started out as a way to get fans to Penn State games without sitting in traffic on  US 80 and State Route 322, has turned into what will become the center of an eVTOL ecosystem for the  East Coast,” said Grant Fisk, Volatus Infrastructure Co-Founder. “We realized that Bellefonte airport is  within 90 miles of all the major cities so it just makes sense to expand this location which will lay the  foundation for the eVTOL infrastructure ecosystem for the East Coast.”

“The Bellefonte Airport was used as one of the first airmail stops at the inception of the Airmail  ecosystem,” said John Elnitski, Bellefonte Airport Manager. “It is fitting that Bellefonte Airport will  again meet this role for eVTOL use.” 

FMI: www.volatusllc.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC