AD: Pilatus | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.09.24

Airborne-NextGen-12.03.24

Airborne-Unlimited-12.04.24

Airborne Flt Training-12.05.24

Airborne-Unlimited-12.06.24

Thu, Jul 17, 2003

AD: Pilatus

AD NUMBER: 2003-14-07
MANUFACTURER:
Pilatus
SUBJECT: Airworthiness Directive 2003-14-07

SUMMARY: This amendment adopts a new airworthiness directive (AD) that applies to all Pilatus Aircraft Ltd. (Pilatus) Models PC-12 and PC-12/45 airplanes. This AD requires you to repetitively replace the nose landing gear (NLG) drag link right-hand part every 4,000 landings until an improved design NLG drag link right-hand part is installed. This AD also requires you to install an improved design NLG drag link right-hand part as terminating action for the repetitive replacements. This AD is the result of mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for Switzerland. The actions specified by this AD are intended to prevent structural failure of the nose landing gear (NLG) caused by fatigue damage to the NLG drag link right-hand part that develops over time. Such failure could result in either an unintended NLG extension during flight or the NLG not properly locking upon extension, which could lead to loss of airplane control during landing operations.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20031407

Advertisement

More News

ANN's Daily Aero-Term (12.07.24): Ultralight Vehicle

Ultralight Vehicle A single-occupant aeronautical vehicle operated for sport or recreational purposes which does not require FAA registration, an airworthiness certificate, or pilo>[...]

ANN's Daily Aero-Linx (12.07.24)

Aero Linx: 1-26 Association The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is found in One Design>[...]

Airborne 12.02.24: Electra FG EIS, Prez Osprey Problems, Starship Wants 25

Also: EAA Ray Foundation, MagniX Records, Ruko U11MINI Drone, RCAF PC-21s Elektra Solar recently put the first aircraft from its Elektra Trainer Fixed-Gear (FG) family into service>[...]

Aero-News: Quote of the Day (12.08.24)

“Airline workers know far too well the devastating effects corporate bankruptcies have on the lives of hardworking Americans. Following 9/11, pilots, including myself, made e>[...]

ANN's Daily Aero-Term (12.08.24): Approach Speed

Approach Speed The recommended speed contained in aircraft manuals used by pilots when making an approach to landing. This speed will vary for different segments of an approach as >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC