AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Feb 19, 2020

AD: General Electric Company Turbofan Engines

AD NUMBER: 2020-01-55

PRODUCT: Certain General Electric Company (GE) GE90-110B1 and GE90-115B model turbofan engines.

ACTION: Final rule; request for comments.

SUMMARY: This AD was sent previously as an emergency AD to all known U.S. owners and operators of the GE GE90-110B1 and GE90- 115B model turbofan engines with certain engine serial numbers.

This AD requires the removal from service of the interstage seal, part number 2505M72P01 or 2448M33P01, from the affected engines. This AD was prompted by a recent event involving an uncontained high-pressure turbine (HPT) failure that resulted in an aborted takeoff.

DATES: This AD is effective March 2, 2020 to all persons except those persons to whom it was made immediately effective by Emergency AD 2020-01-55, issued on January 17, 2020, which contained the requirements of this amendment. The FAA must receive comments on this AD by March 30, 2020.

COST: The FAA estimates that this AD affects 0 engines of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Remove interstage seal

  • Labor: 100 work-hours × $85 per hour = $8,500
  • Parts: $509,600
  • Cost per engine: $518,100
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC