FAA Issues SAIB For Certain Piper Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Feb 24, 2017

FAA Issues SAIB For Certain Piper Aircraft

Warns Of Possible Issue With The Main Landing Gear Drag Link Bolt

The FAA has issued a Special Airworthiness Information Bulletin (SAIB) following the collapse of the main landing gear on a Piper PA-23-250 airplane.

The FAA has found that there is a potential airworthiness concern regarding a failure of the main landing gear drag link bolt, which can cause the main gear to collapse. Fatigue cracking can develop at the midpoint of the bolt shank, which can result in bolt failure and subsequent main gear collapse.

This SAIB is a result of an incident on a Piper Model PA-23-250 airplane where the right main landing gear collapsed during landing. The investigation revealed that the right main landing gear drag link center attach bolt had sheared in the center of the bolt shank due to fatigue.

The FAA recommends that owners and operators of the affected airplanes incorporate Piper Service Bulletin No. 1299, dated January 6, 2017, which recommends periodic replacement of main landing gear drag link bolt and the inspection of the mating bushings.

The airworthiness concern is not an unsafe condition that would warrant AD action
under Title 14 of the Code of Federal Aviation Regulations (14CFR part 39), according to the FAA.

(Image from file)

FMI: SAIB

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC