FAA Dedicates New Air Traffic Control Tower for Long Island MacArthur Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, May 21, 2011

FAA Dedicates New Air Traffic Control Tower for Long Island MacArthur Airport

Twenty-Million Dollar Facility Replaces Tower Built In 1963

The FAA dedicated a new airport traffic control tower for Long Island MacArthur Airport Friday that will replace the one that has served the airport since 1963.

"MacArthur Airport continues to play a vital role in serving travelers in the New York metropolitan region,” said U.S. Transportation Secretary Ray LaHood. “This new tower will enhance the safety and efficiency of air travel in and out of Long Island.”

The new airport traffic control tower is more than 50 feet taller than the old tower, giving controllers a better view of airport operations. Additionally, controllers will now be using the latest in voice communication technology to communicate with pilots. “We're committed to providing controllers with the best possible technology and supporting their mission to keep the flying public safe,” said FAA Administrator Randy Babbitt.  “The enhanced sight-lines and a state-of-the-art communications system represent important safety enhancements for passengers flying to and from MacArthur Airport.”

The facility has the most advanced equipment to record air traffic communications. It also has state-of-the-art heating and cooling systems, as well as fire protection, security, power distribution and grounding systems.

The new 158-foot high tower has a 525-square-foot tower cab.  The total cost to design, equip, and construct the new tower was approximately $20 million.  In 2010, air traffic controllers at MacArthur Airport handled nearly 155,000 takeoffs and landings.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC