Sikorsky, Boeing Selected To Develop 'Digital Backbone' For FVL Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sun, Jul 20, 2014

Sikorsky, Boeing Selected To Develop 'Digital Backbone' For FVL Program

Joint Common Architecture Will Integrate Future Vertical Lift Mission Systems

The Joint Common Architecture (JCA) standard for the U.S. Army’s Joint Multi-Role (JMR) Science and Technology program, an element of the Future Vertical Lift (FVL) initiative will be developed by Boeing and Sikorsky under a Technology Investment Agreement awarded by the U.S. Army Aviation Applied Technology Directorate on June 30.

“The Army considers the JCA to be the ‘digital backbone’ through which mission systems will be seamlessly integrated into the FVL system’s design,” said Samir Mehta, president of Sikorsky Defense Systems & Services. “This is a key component of FVL, and we look forward to providing solutions to support the Army’s efforts. Our solution will help bring efficiency to future rotorcraft platforms.”

“Boeing and Sikorsky bring unparalleled expertise and experience in meeting the needs of Army Aviation,” said David Koopersmith, Boeing vice president and general manager of Vertical Lift programs. “As partners in the JCA and the JMR Technology Demonstrator program, our team combines the best that industry has to offer.”

The JMR TD program supports the U.S. Army’s FVL initiative to deliver the next generation of vertical lift utility and attack aircraft. The Sikorsky-Boeing  proposal, the SB-1 Defiant (pictured), is based on Sikorsky’s X2 Technology rotorcraft design with counter-rotating coaxial main rotors, a pusher propeller and advanced fly-by-wire system. The Army is expected to select from among four teams at the end of July to proceed with the development of demonstration aircraft, which will fly in 2017.

(Image from file)

FMI: www.boeing.com, www.sikorsky.com, www.army.mil

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC