Ballistic Recovery Systems (BRS) Announces Enhanced Repack Centers | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Jul 28, 2010

Ballistic Recovery Systems (BRS) Announces Enhanced Repack Centers

Special Incentives Available For Cirrus, Cessna Owners

By Dan Billingsley

BRS Aerospace President Larry Williams announced Monday at AirVenture that they will begin providing full repack servicing of their whole airframe parachute recovery systems. The aircraft included will be the Cirrus Design SR20 and SR22, as well as Cessna's 172/182s. Every 10 years repacking is required for an STC'd unit and will be accomplished through a collaborative network of certified repair centers.


Larry Williams

The training partnership is with Sim Train, LLC who will use full motion Advanced Airplane Training Devices (AATD). BRS and Sim Train will present the latest innovations in Scenario Based Training for parachute deployment decisions by incorporating actual deployment scenarios into the training session.

The incentive to have BRS do the 10-year repack servicing will be a certificate for one full hour of full motion simulator training. The 2010 repack pricing for and overhauled exchange parachute for Cirrus and Cessna units is $3,682.00 per unit (excluding labor for removal and replacement) to qualified service centers throughout the world. BRS is dedicated to offering very fast service in an effort to get you safely back in the air, therefore, they boast a 4 day turn-around cycle for units received at its facilities in South St. Paul, Minnesota.

FMI: www.BRSAerospace.com, www.FMFsim.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC