Dream Chaser Spaceplane Passes NASA Milestone Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.21.25

Airborne-NextGen-04.22.25

AirborneUnlimited-04.23.25

Airborne-FltTraining-04.24.25

AirborneUnlimited-04.25.25

Sat, Feb 01, 2025

Dream Chaser Spaceplane Passes NASA Milestone Test

Sierra Space Preparing For Launch

Sierra Space announced that its Dream Chaser spaceplane successfully completed the Joint Test 10B milestone in collaboration with NASA. The test demonstrated that Dream Chaser was able to power-on, air-cool, and exchange data with multiple powered payloads in the pressurized cabin.

The testing fulfills an important progression in moving toward a planned mission for Dream Chaser to resupply the International Space Station (ISS).

The successful completion of the test confirms that Dream Chaser will accommodate various payloads. This was done by demonstrating that the vehicle can provide power within a specific range of voltages and maintain the required environmental conditions for those payloads.

In addition, all vehicle and payload data were seen in both Sierra Space’s mission control room in Louisville, Colorado, as well as in the payload support control rooms at the NASA Marshall Spaceflight Center in Huntsville, Alabama.

Three payloads, candidates for flight on Dream Chaser’s first mission DCC-1, were evaluated during the testing:

  •  Polar: A cryogenic system for preserving scientific samples aboard the ISS at temps between -95oC to +10oC
  • Powered Ascent Utility Locker (PAUL): A facility built by Space Tango holding two biological experiments that require power during ascent
  • NASA’s Single Stowage Locker: A standard stowage system carrying experiments and other payloads

 

Anne Currin, Director of Mission Management at Space Tango said, "Space Tango's recent integration testing with the Sierra Space Dream Chaser went well and all teams were very happy with the results. We appreciate the steps the Sierra Space team has taken to get both the vehicle and Space Tango ready for a successful flight. It's been exciting to see this come together as we count down to a maiden flight that is scheduled to increase access for payload delivery to the International Space Station."

FMI:  www.sierraspace.com/

Advertisement

More News

Aero-News: Quote of the Day (04.27.25)

“Our company is moving in the right direction as we start to see improved operational performance across our businesses from our ongoing focus on safety and quality. We conti>[...]

ANN's Daily Aero-Linx (04.27.25)

Aero Linx: International Committee for Airspace Standards and Calibration (ICASC) The International Committee for Airspace Standards and Calibration (ICASC) was created following t>[...]

Classic Aero-TV: Veteran's Airlift Command -- Serving Those Who Served

From 2013 (YouTube Edition): One Of Aviation's Most Positive Efforts... The VAC!!! In all the doddering, misleading, anti-aviation blather we've had to deal with over the last few >[...]

Airborne-NextGen 04.22.25: NYC eVTOL Network, ForgeStar-1, Drone Safety Day

Also: CiES Documents, Hypersonic Tech, SKYTRAC Health Monitoring, Skyryse Archer Aviation announced a blueprint for an eVTOL network in New York City that would connect travelers b>[...]

Airborne 04.21.25: Charter Bust, VeriJet Woes, Visual Approach Risks

Also: Sun Country CEO to Spirit, Indian AF Rafale Jets, Archer-United, Avflight Grows Federal prosecutors recently filed a lawsuit against an uncertified charter flight company and>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC