Senators To FAA: Update Unmanned Aircraft Rules | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Nov 28, 2014

Senators To FAA: Update Unmanned Aircraft Rules

Four Senators Sent Letter To Administrator Huerta Urging Prompt Action

A bipartisan group of U.S. Senators has called on the FAA to speed up approvals for Unmanned Aerial Systems (UAS) test permits, and to ensure the agency’s plans to regulate these aircraft don’t fall behind schedule.

The FAA created six test sites across the country to study unmanned aircraft in response to a request from Congress in 2012 to craft regulations that meet the unique safety challenges posed by UAS. The agency, which is responsible for overseeing the safety of U.S. airspace, has until September 2015 to create a strategy to integrate unmanned aircraft into U.S. airspace.
 
“In light of recent reports, I am concerned that proposed regulations on small, commercial unmanned aircraft will be costly, needlessly restrictive and hinder research and development for the growing UAS industry,” the Senators said in a letter sent to Huerta Wednesday. “The FAA needs to act quickly to alleviate these concerns and issue guidelines for developers and operators of unmanned aircraft that will give certainty to the UAS industry and ensure the safety and privacy of Americans.”
 
Senators Ron Wyden (D-OR), Jeff Merkley (D-OR), Heidi Heitkamp (D-ND), John Hoeven (R-ND), and Cory Booker (D-NJ), asked the FAA to streamline its process for allowing UAS operators to test their aircraft at designated sites. Obtaining a Certificate or Waiver of Authorization can take from two months to a year, according to the FAA.
 
Oregon houses three UAS test ranges: the Warm Springs Indian Reservation and airspace outside Pendleton and Tillamook.

“We remain concerned about the impacts that continued delays in the process are having on the American UAS industry and the national economy, and the safety risk posed by expanding unlicensed operations,” the senators wrote in the letter.
 
Commercial unmanned aircraft use is a growing industry with the potential to contribute significantly to the U.S. economy. The senators noted the possible chilling effect on creative developments in unmanned aircraft technologies without clarification from FAA on how to proceed.
 
“This industry cannot continue to grow without further direction and guidance from the FAA on its planned regulations,” they wrote.

(Images from file)

FMI: www.faa.gov, Full Letter

Advertisement

More News

Aero-News: Quote of the Day (12.18.25)

“These new aircraft strengthen our ability to respond quickly, train effectively and support communities nationwide. Textron Aviation has been a steadfast supporter in helpin>[...]

Classic Aero-TV: Viking Twin Otter 400--Bringing the DHC-6 Back Into Production

From 2011 (YouTube Edition): Rugged, Legendary, STOL Twin Makes A Comeback The de Havilland Twin Otter is an airplane with a long history, and it gained a reputation as a workhorse>[...]

NTSB Final Report: Rans Employee Flying Club Rans S-6ES Coyote II

A Wind Gust Lifted The Right Wing And The Airplane Turned To The Left Analysis: The pilot was departing from a 2,395-ft-long by 50-ft-wide turf runway. The pilot reported that afte>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

ANN's Daily Aero-Term (12.18.25): Braking Action Advisories

Braking Action Advisories When tower controllers receive runway braking action reports which include the terms “medium," “poor," or “nil," or whenever weather con>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC