FAA Releases New Approval For ADS-B Out | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Jul 29, 2014

FAA Releases New Approval For ADS-B Out

Application Package For Operation Outside U.S. Designated Airspace Cut By 90 Percent

The FAA has released the new approval for automatic dependent surveillance-broadcast out (ADS-B Out) operations outside of U.S.-designated airspace.

In the past, the old paragraph, A353, had to be signed off from offices at the local, regional and national FAA offices. The new paragraph, A153, can be approved at the local flight standards district office. Not only does A153 require fewer signatures, but also the application package is less than 10 percent of the size of A353.

“This is a win for the industry,” said NBAA Project Manager, Operations Brian Koester. “This will be very beneficial for operators trying to conduct flights in places like Singapore, Hong Kong or Vietnam where ADS-B Out approval is required for operations above FL290.”

Some operators experienced significant delays in receiving approval for A353. For the more than 200 A353 approvals issued this year, the average approval took three-and-a-half months. Delays of this length restricted some operations to below FL290, where convective weather can be a significant issue.

The faster letter of authorization will allow more operators to take advantage of the satellite-based technology that improves ATC coverage from the World War II radar-based technology. The new technology provides air traffic controllers with an improved picture of the airspace. This allows for reduced separation and greater predictability in arrival and departure times for operators.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC