Pratt & Whitney Tests Gear System For Next Generation Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Aug 14, 2007

Pratt & Whitney Tests Gear System For Next Generation Engine

$12 Million Facility Simulates Operation At Altitude

Pratt & Whitney has initiated performance testing of the fan drive gear system, a key element of its planned next generation Geared Turbofan engine, at the company's new $12 million testing facility in Middletown, CT. The gear system design will undergo critical testing over the next 18 months as part of the company's development plan.

"Initial testing of the fan drive gear system has gone flawlessly," said Bob Saia, vice president, Next Generation Product Family, Pratt & Whitney. "The fan drive gear system is what enables the Geared Turbofan engine to operate at optimum efficiency, delivering the environmental and economical benefits of this game-changing technology."

Pratt & Whitney tells ANN the dedicated gear system testing facility has unique capabilities to simulate in-flight conditions and operational characteristics.

The gear system test rig is capable of handling up to 60,000 shaft horsepower and simulating flight altitudes of up to 45,000 feet. The facility is also capable of creating operational loads to test performance limits of the gear system outside of specifications to validate durability.

FMI: www.pw.utc.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC