Factory Leasing Program Announced For Great Lakes By WACO | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Wed, Dec 03, 2014

Factory Leasing Program Announced For Great Lakes By WACO

Designed To Support Upset Prevention And Recovery Training Flight Schools

WACO Aircraft Corp. has rolled out a new Factory Direct leasing program for the Great Lakes 2T-1A-2. The company says the program is designed to support the Upset Prevention and Recovery Training needs for Flight Schools and help them comply with FAA AC 120-UPRT, FAA AC 120-109 and upcoming ICAO 10011 “Airplane Upset Prevention and Recovery Training” manual guidelines.

This simple lease plan is comprised of a low monthly base lease rate that includes flight hours, then an hourly rate for time over the included base. The program includes all scheduled maintenance. The program can be custom tailored for the unique needs of each school and features a streamlined approval process.
 
The new Great Lakes by WACO is a fully aerobatic, 180 horsepower aircraft featuring docile ground handling yet excellent aerobatic capability. The company says those characteristics make it "the perfect trainer for Loss of Control In-Flight (LOC-I) programs."
 
Integrating Upset Prevention and Recovery Training into your flight curriculum is an upcoming requirement for all part 141 schools.
 
The lease includes:

  • All Scheduled Maintenance including parts
  • Oil Changes (every 50 hours)
  • 100 Hour Inspections
  • Annual Inspections
  • Pitot and Static certification
  • Squawks affecting the airworthiness of the airplane
  • Engine Replacement at TBO (1600 hours)
  • Complete aircraft overhaul at the factory every 3200 hours

The airplane has been certified by both FAA and EASA for transition training for instructors needing minimal checkout time.

(Image provided by WACO Aircraft)

FMI: www.wacoaircraft.com

 


Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC