AeroSports Update: Sling Airplane To Be Built In 4 Days | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Sep 18, 2014

AeroSports Update: Sling Airplane To Be Built In 4 Days

The Sling 4-4-40 Challenge Has Started And 40 Workers Will Attempt To Build And Fly A Sling 4 In Just 4 Days!

A team of 40 workers from The Airplane Factory, including admin, catering, and marketing staff, will attempt to build and fly a Sling 4 in four days! The build will take place at the 2014 Africa Aerospace and Defense Expo at the Waterkloof Air Force Base in South Africa. The project started yesterday and is planned to be completed on Saturday, September 20th.

The team will work around the clock, with the day and night being split into 10 and 14 hour shifts, respectively. The build processes and procedures will essentially follow the same pattern as they do when a plane is built at the factory, but there will be two teams working on an airframe sub-assembly at a time instead of one. At the same time, the electrical, upholstery, and engine installation teams will work on their respective projects. All will come together on day three, just in time for the final assembly team to work through the night in preparation for a test flight on Saturday afternoon.

This is not the first time that The Airplane Factory has undertaken such an exciting project. Back in 2011, the Sling 5577 Challenge took place, in which 5 men from the factory and 5 women who never had touched a rivet gun built a Sling 2 in 7 days. It then took an additional 7 to fly the aircraft from Johannesburg to Poland, where it was delivered to an eager customer.

FMI: www.facebook.com/TheAirplaneFactory
 

Advertisement

More News

ANN's Daily Aero-Term (11.19.25): Option Approach

Option Approach An approach requested and conducted by a pilot which will result in either a touch-and-go, missed approach, low approach, stop-and-go, or full stop landing. Pilots >[...]

Aero-News: Quote of the Day (11.19.25)

"Emirates is already the world's largest Boeing 777 operator, and we are expanding our commitment to the program today with additional orders for 65 Boeing 777-9s. This is a long-t>[...]

NTSB Final Report: Sting Sport TL-2000

(Pilot) Reported That There Was A Sudden And Violent Vibration Throughout The Airplane That Lasted Several Seconds Analysis: The pilot was returning to his home airport at an altit>[...]

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC