Boeing Completes 737 MAX 8 Firm Configuration | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Jul 25, 2013

Boeing Completes 737 MAX 8 Firm Configuration

Engineers Begin Detailed Design, Program On Track For First Delivery In Third Quarter 2017

The firm configuration of the 737 MAX 8 has been finalized by Boeing. This milestone marks completion of the major trade studies that define the capabilities of the 737 MAX family.

"We have defined the design requirements for the 737 MAX that provide our customers with the most value in the single-aisle market," said Michael Teal, chief project engineer, 737 MAX, Boeing Commercial Airplanes. "We continue to follow our disciplined process to ensure that we have completed all the requirements for the development stage of the program and are ready to begin the detailed design phase."

As detailed designs are completed and released, production can begin. Final assembly of the 737 MAX 8 is scheduled to begin in 2015 with first delivery scheduled for the third quarter of 2017.

Boeing projects that the 737 MAX will be 13 percent more fuel-efficient than today's most efficient single-aisle airplanes and 8 percent more fuel-efficient per seat than tomorrow's competition. The configuration includes new LEAP-1B engines from CFM International that are optimized for the 737 MAX, a redesigned tail cone and the Boeing designed Advanced Technology Winglet to reduce fuel use. Other changes incorporated include upgrades to the flight deck displays, an electronic bleed air system and fly-by-wire spoiler flight controls.

"The 737 MAX will not only be the most fuel-efficient airplane, it will maintain the 737's industry-leading reliability," said Keith Leverkuhn, vice president and program manager, 737 MAX program, Boeing Commercial Airplanes. "We are working closely with our customers and industry partners to ensure that the airplane we deliver will perform as promised."

Additionally the MAX will take advantage of advancements in connectivity. "As we continue to improve connectivity on the 737 platform, the 737 MAX will offer customers the capability to use real-time data to make operational decisions around maintenance on the ground during flight," said Leverkuhn. "This will allow airlines to more efficiently manage their fleets. Enhanced connectivity also will benefit passengers as the demand for more wireless access to information and entertainment in flight continues to grow."

The 737 MAX family includes the 737 MAX 7, 737 MAX 8 and 737 MAX 9 and will serve the 100- to over 200-seat market. The 737 MAX will extend the Next-Generation 737 range advantage with the capability to fly more than 3,500 nautical miles, an increase of 400-540 nm over the Next-Generation 737. First delivery of the 737 MAX 9 is planned for 2018 followed by first delivery of the MAX 7 in 2019.

To date, the 737 MAX has accumulated orders for 1,495 airplanes.

(Boeing 737 MAX Artist's rendering from file)

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Cozy Cub

Witness Reported The Airplane Was Flying Low And Was In A Left Bank When It Struck The Power Line Analysis: The pilot was on final approach to land when the airplane collided with >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Seated On The Edge Of Forever -- A PPC's Bird's Eye View

From 2012 (YouTube Edition): A Segment Of The Sport Aviation World That Truly Lives "Low And Slow" Pity the life of ANN's Chief videographer, Nathan Cremisino... shoot the most exc>[...]

ANN's Daily Aero-Linx (04.29.25)

Aero Linx: International Business Aviation Council (IBAC) IBAC promotes the growth of business aviation, benefiting all sectors of its industry and in all regions of the world. As >[...]

ANN's Daily Aero-Term (04.29.25): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC