General Atomics Awarded Initial EMALS Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Aug 18, 2014

General Atomics Awarded Initial EMALS Contract

System Will Be Installed On Future Aircraft Carrier John F. Kennedy

U.S. Naval Air Systems Command (NAVAIR) awarded General Atomics (GA) an initial sole-source contract for Electromagnetic Aircraft Launch System (EMALS) and Advanced Arresting Gear (AAG) for the CVN 79 aircraft carrier to be named John F. Kennedy.

This contract is for the initial procurement of the long-lead-time materials in support of a full production contract for installation of EMALS and AAG into CVN 79, the second of the Gerald R. Ford-class aircraft carriers. CVN 79 is scheduled to be delivered to the U.S. Navy in 2023.

GA Electromagnetic Systems Group will manufacture EMALS and AAG components at its state-of-the-art 367,000 square foot manufacturing facility in Tupelo, Miss.

“These are exciting times. We are beginning EMALS and AAG production for the second ship in the class, CVN 79, as these systems are being integrated into the Gerald R. Ford (CVN 78). We are proud to be part of the team that is putting cutting-edge technology into the world’s premier aircraft carriers and into the hands of Naval forces,” says Dean Key, Director of Launch and Recovery Production Programs, General Atomics.

GA was awarded the prime contract to provide EMALS and AAG systems for CVN 78 in June 2009 and is manufacturing the CVN 78 hardware concurrently with the System Design and Demonstration (SDD) programs. Hardware delivery to CVN 78 is scheduled to be completed in 2014.

(Image provided by General Atomics)

FMI: www.navy.mil, www.ga.com

 


Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC